The construction of an underground car park required an excavation in sand under the water table adjacent to the cathedral of Buen Pastor in San Sebastián, Spain. Because of the close proximity of the cathedral and other buildings, control of ground movements was a paramount consideration in the design. Construction involved the use of diaphragm walls propped by the floor slabs using the top-down technique. A monitoring system was installed to control the performance of the excavation throughout. For water control during the excavation, the diaphragm walls reached an underlying low permeability silt layer. This decision required the adoption of special measures to connect hydraulically the foundation ground of the cathedral with the water l...
An integrated geophysical survey was conducted in September 2007 at the Cathedral of Ta...
The development of an underground station below the water table requires rigorous and careful planni...
The research aimed to improve the interaction between engineering geology, archaeology and civil eng...
The construction of an underground car park required an excavation in sand under the water table adj...
During the construction of a new building in the centre of Salerno (Italy), a buried two-level car p...
The completion of the downtown stretch of Line 1 of the Napoli (Italy) underground involved the cons...
A new building recently constructed in the centre of the city of Salerno, Italy, comprises a two lev...
The Church of La Purísima Concepcion, raised in 1515 as the second parish of Huelva (Spain) has been...
In the framework of the construction of the high-speed railway passing through Barcelona, a large ex...
ABSTRACT: Geotechnical conditions of an underground parking project in the city centre of Concepción...
[EN] The Church of Asunción of Llíria (Valencia, Spain) is one of the best examples of the Valencian...
In order to carry out deep excavations under the water table in urban environments, the safety of th...
In the framework of Mo.S.E. project for the protection of Venice against exceptional high tides, the...
Line 6 of the Metro of Napoli underpasses one of the corner of an old church, built in the 16th cent...
The Church of La Purísima Concepcion, raised in 1515 as the second parish of Huelva (Spain) has been...
An integrated geophysical survey was conducted in September 2007 at the Cathedral of Ta...
The development of an underground station below the water table requires rigorous and careful planni...
The research aimed to improve the interaction between engineering geology, archaeology and civil eng...
The construction of an underground car park required an excavation in sand under the water table adj...
During the construction of a new building in the centre of Salerno (Italy), a buried two-level car p...
The completion of the downtown stretch of Line 1 of the Napoli (Italy) underground involved the cons...
A new building recently constructed in the centre of the city of Salerno, Italy, comprises a two lev...
The Church of La Purísima Concepcion, raised in 1515 as the second parish of Huelva (Spain) has been...
In the framework of the construction of the high-speed railway passing through Barcelona, a large ex...
ABSTRACT: Geotechnical conditions of an underground parking project in the city centre of Concepción...
[EN] The Church of Asunción of Llíria (Valencia, Spain) is one of the best examples of the Valencian...
In order to carry out deep excavations under the water table in urban environments, the safety of th...
In the framework of Mo.S.E. project for the protection of Venice against exceptional high tides, the...
Line 6 of the Metro of Napoli underpasses one of the corner of an old church, built in the 16th cent...
The Church of La Purísima Concepcion, raised in 1515 as the second parish of Huelva (Spain) has been...
An integrated geophysical survey was conducted in September 2007 at the Cathedral of Ta...
The development of an underground station below the water table requires rigorous and careful planni...
The research aimed to improve the interaction between engineering geology, archaeology and civil eng...