학위논문 (석사)-- 서울대학교 대학원 : 에너지시스템공학부, 2015. 2. 황일순.In May 2013, it turned out that a few items were supplied to NPPs with fraudulent certificate. The documents were the reports of verification - Quality Verification Document (QVD), Equipment qualification (EQ), and Commercial Grade Items Dedication (CGID) - which are required to submit when suppliers deliver the items to the operator. The fraudulent documents were the result of collusion between suppliers and certificate authorities. As the unqualified items were detected, operators had to halt the operation and delay the construction of NPPs for the replacement of fraudulent items and inspection on overall facilities. As the result, power reserve level dropped significantly and rolling blacko...