This report is written to present the entire industrial attachment experience and also to present the achievement on the different projects being tasked assigned to the author
For the 22-week Industrial Attachment, the author was recruited by CNA Group Ltd, and was attached t...
This report describes the projects done and the work experience acquired during the industrial attac...
This report outlines the two projects undertaken during the IA period, explaining the requirements f...
The report focuses on the projects and assignments undertaken during the period of industrial attach...
The purpose of this report is to provide a summary on the Professional Attachment with the Singapor...
The objective of the attachment was for the author to perform the role of Operations and Support (O&...
The report starts off with a brief introduction of the company. This is followed by a detailed prese...
This report covered the 3 main projects assigned: F404-GE-100D Engine Defect Analysis for Year 2000,...
The development of the project involves product outlook designing, circuitry designing, appropriate ...
This IA report serves as an account on the experience earned during the author’s 6 month work in Goo...
This report describes the Electronic Failure Analysis (EFA) training received and experienced gained...
This report summarizes the project that were assigned to me and also the knowledge and experiences g...
This report illustrates the author’s 20-week of internship experience. The author served as an inter...
For the industrial attachment with ExxonMobil Asia Pacific which lasted from 9 Jan 2012 to 9 June 20...
The 22-weeks (5rd January to 6th June 2005) Industrial Attachment (IA) program provided the author a...
For the 22-week Industrial Attachment, the author was recruited by CNA Group Ltd, and was attached t...
This report describes the projects done and the work experience acquired during the industrial attac...
This report outlines the two projects undertaken during the IA period, explaining the requirements f...
The report focuses on the projects and assignments undertaken during the period of industrial attach...
The purpose of this report is to provide a summary on the Professional Attachment with the Singapor...
The objective of the attachment was for the author to perform the role of Operations and Support (O&...
The report starts off with a brief introduction of the company. This is followed by a detailed prese...
This report covered the 3 main projects assigned: F404-GE-100D Engine Defect Analysis for Year 2000,...
The development of the project involves product outlook designing, circuitry designing, appropriate ...
This IA report serves as an account on the experience earned during the author’s 6 month work in Goo...
This report describes the Electronic Failure Analysis (EFA) training received and experienced gained...
This report summarizes the project that were assigned to me and also the knowledge and experiences g...
This report illustrates the author’s 20-week of internship experience. The author served as an inter...
For the industrial attachment with ExxonMobil Asia Pacific which lasted from 9 Jan 2012 to 9 June 20...
The 22-weeks (5rd January to 6th June 2005) Industrial Attachment (IA) program provided the author a...
For the 22-week Industrial Attachment, the author was recruited by CNA Group Ltd, and was attached t...
This report describes the projects done and the work experience acquired during the industrial attac...
This report outlines the two projects undertaken during the IA period, explaining the requirements f...