This report covered the 3 main projects assigned: F404-GE-100D Engine Defect Analysis for Year 2000, Engine Health Monitoring System (EHMS) for F404-GE-100D and Technical Investigation for damage engine components for F100-PW-229 engine
This report summarizes the project that were assigned to me and also the knowledge and experiences g...
This report outlines the two projects undertaken during the IA period, explaining the requirements f...
For the industrial attachment with ExxonMobil Asia Pacific which lasted from 9 Jan 2012 to 9 June 20...
This report is written to present the entire industrial attachment experience and also to present th...
The development of the project involves product outlook designing, circuitry designing, appropriate ...
The report starts off with a brief introduction of the company. This is followed by a detailed prese...
This report describes the Electronic Failure Analysis (EFA) training received and experienced gained...
The report focuses on the projects and assignments undertaken during the period of industrial attach...
The report gives an overview to the transformation in the production management method. It will show...
This report summarized the projects completed during the Industrial Attachment with IBM Singapore, A...
This industrial attachment report provides a detailed description of the industrial attachment progr...
This report summarizes the projects undertake by the author during his industrial attachment in Emer...
This report cover details of the LRT system structure, PA system design concepts, technical aspects ...
The 22-weeks (5rd January to 6th June 2005) Industrial Attachment (IA) program provided the author a...
The objective of the attachment was for the author to perform the role of Operations and Support (O&...
This report summarizes the project that were assigned to me and also the knowledge and experiences g...
This report outlines the two projects undertaken during the IA period, explaining the requirements f...
For the industrial attachment with ExxonMobil Asia Pacific which lasted from 9 Jan 2012 to 9 June 20...
This report is written to present the entire industrial attachment experience and also to present th...
The development of the project involves product outlook designing, circuitry designing, appropriate ...
The report starts off with a brief introduction of the company. This is followed by a detailed prese...
This report describes the Electronic Failure Analysis (EFA) training received and experienced gained...
The report focuses on the projects and assignments undertaken during the period of industrial attach...
The report gives an overview to the transformation in the production management method. It will show...
This report summarized the projects completed during the Industrial Attachment with IBM Singapore, A...
This industrial attachment report provides a detailed description of the industrial attachment progr...
This report summarizes the projects undertake by the author during his industrial attachment in Emer...
This report cover details of the LRT system structure, PA system design concepts, technical aspects ...
The 22-weeks (5rd January to 6th June 2005) Industrial Attachment (IA) program provided the author a...
The objective of the attachment was for the author to perform the role of Operations and Support (O&...
This report summarizes the project that were assigned to me and also the knowledge and experiences g...
This report outlines the two projects undertaken during the IA period, explaining the requirements f...
For the industrial attachment with ExxonMobil Asia Pacific which lasted from 9 Jan 2012 to 9 June 20...