Being a tiny island, Singapore is facing problems such as lack of spaces and over-population. Like many other countries, Singapore is actively expanding. However, due to scarce land, Singapore cannot expand outwards but underground. With new and advanced technology emerging, Singapore is looking to optimize land space by developing underground projects. Currently, Singapore has managed to kick-start two major underground projects – the Underground Ammunition Facility (completed in 2008) and Jurong Rock Caverns (Officially opened in 2014). A strategic usage of underground spaces can be very effective. However, more often than not, underground development projects usually involve uncertainties and risks. This is especially true for large-sca...
This final year project provides the fundamental knowledge of risk management framework for a tunnel...
Nowadays, the world is witnessing an ever-increasing need for tunnels because of their unique charac...
This Final Year Project (FYP) Report covers the basic fundamentals of risks and risk management for ...
Singapore has been developing rapidly in the recent years and the issue with shortage of land has be...
The applicability of the Decision Aids for Tunneling (DAT) as an early construction cost and time pr...
The Final Year Project (FYP) covers the need for risk analysis, types of risk particularly in constr...
Land scarcity is a perpetual constraint in Singapore and one solution is to develop underground spac...
Many cost-time models available today are based on previous underground construction projects where ...
This Final Year Report covers the analysis of underground tunnelling projects and develops a framewo...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, ...
The decision aids for tunneling (DAT) are a computer-based tool with which tunnel construction cost ...
Constructing tunnels underground is generally described as a high-risk activity owing to the fact th...
A new risk analysis system for estimating the risk factors in tunneling is suggested in consideratio...
This Final Year Project (FYP) Report covers the basic knowledge of risk assessment for an undergroun...
Zhao, X ORCiD: 0000-0003-0153-5173International construction joint ventures (ICJVs) have been widely...
This final year project provides the fundamental knowledge of risk management framework for a tunnel...
Nowadays, the world is witnessing an ever-increasing need for tunnels because of their unique charac...
This Final Year Project (FYP) Report covers the basic fundamentals of risks and risk management for ...
Singapore has been developing rapidly in the recent years and the issue with shortage of land has be...
The applicability of the Decision Aids for Tunneling (DAT) as an early construction cost and time pr...
The Final Year Project (FYP) covers the need for risk analysis, types of risk particularly in constr...
Land scarcity is a perpetual constraint in Singapore and one solution is to develop underground spac...
Many cost-time models available today are based on previous underground construction projects where ...
This Final Year Report covers the analysis of underground tunnelling projects and develops a framewo...
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Civil and Environmental Engineering, ...
The decision aids for tunneling (DAT) are a computer-based tool with which tunnel construction cost ...
Constructing tunnels underground is generally described as a high-risk activity owing to the fact th...
A new risk analysis system for estimating the risk factors in tunneling is suggested in consideratio...
This Final Year Project (FYP) Report covers the basic knowledge of risk assessment for an undergroun...
Zhao, X ORCiD: 0000-0003-0153-5173International construction joint ventures (ICJVs) have been widely...
This final year project provides the fundamental knowledge of risk management framework for a tunnel...
Nowadays, the world is witnessing an ever-increasing need for tunnels because of their unique charac...
This Final Year Project (FYP) Report covers the basic fundamentals of risks and risk management for ...