Since independence, the Singapore government have been actively searching for a sustainable water source. For a country with limited land and water resources, utilizing the available underground space to increase the water storage capacity seem viable, and practical. Hence, this report seeks to determine the feasibility of constructing an underground cavern within the competent rocks of the Bukit Timah Granite formation, where an underground hydropower system is incorporated to harvest the potential and kinetic energy from the falling water. This report delivers a conceptual design of a pumped-storage hydropower system designed for Singapore. The proposed facility will integrate an existing surface reservoir with the constructed caverns loc...
This study was conducted to design a small hydropower project at Dor River in Abbottabad, Khyber Pak...
Malaysia is a country with rich water resources including its surface water such as river, reservoir...
The technical and economic aspects of constructing a very high head underground hydroelectric pumped...
Singapore has been plagued by water supply issues since its independence in 1965. With limited land ...
The purpose of this report is to determine the feasibility of utilizing an underground cavern as a w...
Singapore is a small island republic of only 633 km2 in area. Two of its major constraints are the s...
Due to the scarce land resources in Singapore, increasing the water storage capacities in the underg...
The purpose of this report is to study the feasibility of harnessing tidal energy leveraging on tide...
In this report, Singapore’s rainfall is analysed in order to determine the estimated total amount of...
Groundwater utilization has been an active subject of study in the quest for more water. Advancement...
Land scarcity is a perpetual constraint in Singapore and one solution is to develop underground spac...
An increasing power demand and a transition towards more renewable energy sources have led to an inc...
This report aims to consolidate what the student has learnt and experienced throughout her progress ...
A subsurface dam is a facility that stores groundwater in the pores of strata and uses groundwater i...
Renewable energy sources, such as wind energy, are gaining a lot of traction across the world. India...
This study was conducted to design a small hydropower project at Dor River in Abbottabad, Khyber Pak...
Malaysia is a country with rich water resources including its surface water such as river, reservoir...
The technical and economic aspects of constructing a very high head underground hydroelectric pumped...
Singapore has been plagued by water supply issues since its independence in 1965. With limited land ...
The purpose of this report is to determine the feasibility of utilizing an underground cavern as a w...
Singapore is a small island republic of only 633 km2 in area. Two of its major constraints are the s...
Due to the scarce land resources in Singapore, increasing the water storage capacities in the underg...
The purpose of this report is to study the feasibility of harnessing tidal energy leveraging on tide...
In this report, Singapore’s rainfall is analysed in order to determine the estimated total amount of...
Groundwater utilization has been an active subject of study in the quest for more water. Advancement...
Land scarcity is a perpetual constraint in Singapore and one solution is to develop underground spac...
An increasing power demand and a transition towards more renewable energy sources have led to an inc...
This report aims to consolidate what the student has learnt and experienced throughout her progress ...
A subsurface dam is a facility that stores groundwater in the pores of strata and uses groundwater i...
Renewable energy sources, such as wind energy, are gaining a lot of traction across the world. India...
This study was conducted to design a small hydropower project at Dor River in Abbottabad, Khyber Pak...
Malaysia is a country with rich water resources including its surface water such as river, reservoir...
The technical and economic aspects of constructing a very high head underground hydroelectric pumped...