ABSTRACTMANAGEMENT OF RADIOACTIVE WASTE FROM OPERATION OF NUCLEAR POWER PLANT -PERSPECTIVE FOR INDONESIAN PROGRAM-. Nuclear power is the only energy industry which takes full responsibility for all its wastes, and costs this into the product. Nuclear power is characterized by the very large amount of energy available from a very small amount of fuel. The amount of waste is also relatively small. It is predicted in the near future of Indonesia NPP program, about approximately 200m3 of low and intermediate level waste and 6,76m3 of spent fuel is taken each year from the core of a l000 MWe Nuclear Power Plant. There is a new option for the spent fuel management i.e. repatriation of the spent fuel to the supplier country through Global Energy P...
Nigeria’s current dismal national power generation capacity provides impetus for the present quest b...
Pembangunan PLTN (Pembangkit Listrik Tenaga Nuklir) di Indonesia, segera dilakukan di wilayah sekita...
PENGELOLAAN LIMBAH RADIOAKTIF CAIR PEMBANGKIT LISTRIK TENAGA NUKLIR 1000 MW. Kebanyakan Pembangkit L...
MANAGEMENT OF RADIOACTIVE WASTE FROM OPERATION OF NUCLEAR POWER PLANT -PERSPECTIVE FOR INDONESIAN PR...
Indonesia’s current strategy on fuel cycles is open c cle until a couple of decades after the operat...
The analysis of the infrastructure for radioactive waste management in Indonesia has been studied us...
The analysis of the infrastructure for radioactive waste management in Indonesia has been studied us...
POTENTIAL SITE SELECTION OF DISPOSAL FOR RADIOACTIVE WASTEGENERATED FROM NPP OPERATION IN SOUTH BANG...
ABSTRACT In the event of supporting the long term national energy need, in the near future Indonesia...
STUDI PENGELOLAAN BAHAN BAKAR NUKLIR BEKAS PLTN JENIS PWR DAN BWR. Telah dilakukan studi tentang pen...
Limbah radioaktif yang ditimbulkan dari Pembangkit Listrik Tenaga Nuklir (PLTN) dengan daya 1000 MWe...
Limbah radioaktif yang ditimbulkan dari Pembangkit Listrik Tenaga Nuklir (PLTN) dengan daya 1000 MWe...
The civilian radioactive waste encompasses a wide range of materials, most of the current debate foc...
PENGELOLAAN LIMBAH RADIOAKTIF CAIR PEMBANGKIT LISTRIK TENAGA NUKLIR 1000 MW. Kebanyakan Pembangkit L...
Razgradnja i demontaža nuklearnih elektrana predstavljaju završnu fazu životnoga vijeka nuklearnih p...
Nigeria’s current dismal national power generation capacity provides impetus for the present quest b...
Pembangunan PLTN (Pembangkit Listrik Tenaga Nuklir) di Indonesia, segera dilakukan di wilayah sekita...
PENGELOLAAN LIMBAH RADIOAKTIF CAIR PEMBANGKIT LISTRIK TENAGA NUKLIR 1000 MW. Kebanyakan Pembangkit L...
MANAGEMENT OF RADIOACTIVE WASTE FROM OPERATION OF NUCLEAR POWER PLANT -PERSPECTIVE FOR INDONESIAN PR...
Indonesia’s current strategy on fuel cycles is open c cle until a couple of decades after the operat...
The analysis of the infrastructure for radioactive waste management in Indonesia has been studied us...
The analysis of the infrastructure for radioactive waste management in Indonesia has been studied us...
POTENTIAL SITE SELECTION OF DISPOSAL FOR RADIOACTIVE WASTEGENERATED FROM NPP OPERATION IN SOUTH BANG...
ABSTRACT In the event of supporting the long term national energy need, in the near future Indonesia...
STUDI PENGELOLAAN BAHAN BAKAR NUKLIR BEKAS PLTN JENIS PWR DAN BWR. Telah dilakukan studi tentang pen...
Limbah radioaktif yang ditimbulkan dari Pembangkit Listrik Tenaga Nuklir (PLTN) dengan daya 1000 MWe...
Limbah radioaktif yang ditimbulkan dari Pembangkit Listrik Tenaga Nuklir (PLTN) dengan daya 1000 MWe...
The civilian radioactive waste encompasses a wide range of materials, most of the current debate foc...
PENGELOLAAN LIMBAH RADIOAKTIF CAIR PEMBANGKIT LISTRIK TENAGA NUKLIR 1000 MW. Kebanyakan Pembangkit L...
Razgradnja i demontaža nuklearnih elektrana predstavljaju završnu fazu životnoga vijeka nuklearnih p...
Nigeria’s current dismal national power generation capacity provides impetus for the present quest b...
Pembangunan PLTN (Pembangkit Listrik Tenaga Nuklir) di Indonesia, segera dilakukan di wilayah sekita...
PENGELOLAAN LIMBAH RADIOAKTIF CAIR PEMBANGKIT LISTRIK TENAGA NUKLIR 1000 MW. Kebanyakan Pembangkit L...