This paper describes a method for scheduling trains on the Hunter Valley Coal Chain rail network. Coal for a particular ship is railed from different mines to stockpiles at one of the Port’s terminals. The coal producers decide which mines will supply each order in what proportion, so there is no flexibility in the allocation of mines to cargoes. We are presented with a list of tonnes of coal which need to be transported from specified load points at mines to specified stockpiles at the port. The operators of the rail network provide a number of paths, with specified arrival and departure times, that can be used for coal movement. The requirement to assign coal trains to ...
The Hunter Valley Coal Chain (HVCC), with 40 coal mines, 30 load points, 3 coal loading terminals (9...
Because of an increase in population, the demand for coal has drastically risen with millions of ton...
This paper investigates potential configuration challenges in the development of optimization-based ...
This paper describes a method for scheduling trains on the Hunter Valley Coal Chain rail n...
This research deals with an innovative methodology for optimising the coal train scheduling problem....
This paper presents a new model applied to produce efficient schedules by solving the coal transport...
Because of the bottlenecking operations in a complex coal rail system, millions of dollars are coste...
The Hunter Valley Coal Chain (HVCC) consists of mining companies, rail operators, rail track owners ...
Many large coal mining operations in Australia rely heavily on the rail network to transport coal fr...
We consider an integrated planning and scheduling problem motivated by the coal supply chains in Aus...
We study the problem of freight transportation in railway networks, where both passenger and freight...
This work introduces a model of the crew scheduling problem for the operation of trains in the minin...
The problem of scheduling the transportation of goods from one location to another is one that arise...
none3We study the problem of freight transportation in railway networks, where both passenger and fr...
Operating a coal export terminal (CET) is a challenging task. The throughput of the terminal and the...
The Hunter Valley Coal Chain (HVCC), with 40 coal mines, 30 load points, 3 coal loading terminals (9...
Because of an increase in population, the demand for coal has drastically risen with millions of ton...
This paper investigates potential configuration challenges in the development of optimization-based ...
This paper describes a method for scheduling trains on the Hunter Valley Coal Chain rail n...
This research deals with an innovative methodology for optimising the coal train scheduling problem....
This paper presents a new model applied to produce efficient schedules by solving the coal transport...
Because of the bottlenecking operations in a complex coal rail system, millions of dollars are coste...
The Hunter Valley Coal Chain (HVCC) consists of mining companies, rail operators, rail track owners ...
Many large coal mining operations in Australia rely heavily on the rail network to transport coal fr...
We consider an integrated planning and scheduling problem motivated by the coal supply chains in Aus...
We study the problem of freight transportation in railway networks, where both passenger and freight...
This work introduces a model of the crew scheduling problem for the operation of trains in the minin...
The problem of scheduling the transportation of goods from one location to another is one that arise...
none3We study the problem of freight transportation in railway networks, where both passenger and fr...
Operating a coal export terminal (CET) is a challenging task. The throughput of the terminal and the...
The Hunter Valley Coal Chain (HVCC), with 40 coal mines, 30 load points, 3 coal loading terminals (9...
Because of an increase in population, the demand for coal has drastically risen with millions of ton...
This paper investigates potential configuration challenges in the development of optimization-based ...