The current Air Traffic Management (ATM) functional approach is changing: ‘time’ is now integrated as an additional fourth dimension on trajectories. This notion will impose on aircraft the compliance of accurately arrival times over designated checkpoints, called Time Windows (TWs). In this context, we review the operational concept of 4D-trajectories, by initially developing an analysis of basic requirements for their implementation in the Communications, Navigation and Surveillance (CNS) systems and then by investigating their management in the future ATM context. We focus on defining the relationships between 4D-trajectories and other concepts and systems of the future ATM framework, and the needs that it will require for its applicatio...
A shift from the current Air Traffic Management (ATM) operational scheme to Trajectory-Based Operation...
Two of the major projects in ATM development, SESAR and NextGen, both fore- cast the use of 4D traje...
Performing the paradigm shift to 4D-Trajectory-Based Operations will involve several procedural impr...
In the present ATC system conflicts between aircraft are detected and resolved in a stated-based app...
The increase of air traffic rates registered in the recent years and the forecast for the next twent...
The introduction of new Air Traffic Management (ATM) concepts such as Trajectory Based Operations (T...
The software architecture and some preliminary results of an innovative ground-based Air Traffic Man...
Significant evolutions of aircraft, airspace and airport systems design and operations are driven by...
This paper presents Multi Objective Trajectory Optimization (MOTO) algorithms that were developed fo...
A key element of future Air Traffic Management concepts like SESAR or NextGen is the stepwise introd...
As part of the current initiatives aimed at enhancing safety, efficiency and environmental sustainab...
New Air Traffic Management (ATM) concepts aim at enabling an increase in air traffic while at the sa...
Technical systems tend to undergo changes and thus will sooner or later require adjustments to new r...
It is to be expected that the task of an air traffic controller will change with the introduction of...
One of the key elements of the two major Air Traffic Management initiatives SESAR and NextGen is 4D-...
A shift from the current Air Traffic Management (ATM) operational scheme to Trajectory-Based Operation...
Two of the major projects in ATM development, SESAR and NextGen, both fore- cast the use of 4D traje...
Performing the paradigm shift to 4D-Trajectory-Based Operations will involve several procedural impr...
In the present ATC system conflicts between aircraft are detected and resolved in a stated-based app...
The increase of air traffic rates registered in the recent years and the forecast for the next twent...
The introduction of new Air Traffic Management (ATM) concepts such as Trajectory Based Operations (T...
The software architecture and some preliminary results of an innovative ground-based Air Traffic Man...
Significant evolutions of aircraft, airspace and airport systems design and operations are driven by...
This paper presents Multi Objective Trajectory Optimization (MOTO) algorithms that were developed fo...
A key element of future Air Traffic Management concepts like SESAR or NextGen is the stepwise introd...
As part of the current initiatives aimed at enhancing safety, efficiency and environmental sustainab...
New Air Traffic Management (ATM) concepts aim at enabling an increase in air traffic while at the sa...
Technical systems tend to undergo changes and thus will sooner or later require adjustments to new r...
It is to be expected that the task of an air traffic controller will change with the introduction of...
One of the key elements of the two major Air Traffic Management initiatives SESAR and NextGen is 4D-...
A shift from the current Air Traffic Management (ATM) operational scheme to Trajectory-Based Operation...
Two of the major projects in ATM development, SESAR and NextGen, both fore- cast the use of 4D traje...
Performing the paradigm shift to 4D-Trajectory-Based Operations will involve several procedural impr...