This paper builds upon the findings of a site investigation into the causes of longitudinal cracks that developed soon after the re-construction of Himes and Johnson Streets in the City of Norman, Oklahoma between May to September 2012. The re‒construction of the city street pavement and base course were completed during a protracted drought period, and shortly after completion of the pavement section longitudinal cracks occurred predominantly along the curb line. The case history concluded that the drought conditions resulted in significant subgrade soil shrinkage. The shrinkage caused changes in soil suction with depth resulting in tensile stresses in the asphalt pavement and stabilized subbase that lead to the pavement cracking. A simple...