A new method was established to estimate the ultimate load, which is utilized in the assessment of pile test. In the present study twenty five reports of failure test piles (28.5 x 28.5 cm in dimensions, 12 m in depth and the working load was 40 ton) of Um-Alqura Mosque project were studied in according to their loading and settlement. The (mean ± SD) of the pile settlement for each load of all piles studied were determined, and the results obtained were utilized to generate the equation that correlates between the load and settlement using (4th degree polynomial fit graph). The equation obtained was applied to estimate the ultimate load for the maximum settlement (10% of the pile diameter). The estimated ultimate load (130 ton) in the pres...
The objectives ofthis project is to compare various method of bearing capacity determination (analy...
This study aims to estimate the ultimate resistances and initial stiffnesses of shaft and base of a ...
In the literature, various "failure criteria" or methods of estimating the failure load in pile load...
A new method was established to estimate the ultimate load, which is utilized in the assessment of p...
A new method for the evaluation of the ultimate load of piles by tests not carried to failure is pro...
A new method for the evaluation of the ultimate load of piles by tests not carried to failure is pro...
The precise prediction of maximum load carrying capacity of bored piles is a complex problem because...
The pile’s ultimate capacity or failure load must be computed by some criteria using load-settlement...
None of numerous previous methods for predicting pile capacity is known how accurate any of them are...
Pile load tests cost generally about Rs.200,000/- and are included in almost all major bridge Projec...
Pile is one of many solutions in foundation engineering practice. Buildings supported on piles were ...
This study focuses on how one can possibly predict the ultimate load for the piles that did not reac...
Prediction of pile capacity is performed, however, the statistical analyses and evaluation of the pr...
Testing of bored piles is carried out to investigate the load-settlement behavior of the tested pile...
This paper presents the analysis of static load tests that is carried out on axially loaded piles in...
The objectives ofthis project is to compare various method of bearing capacity determination (analy...
This study aims to estimate the ultimate resistances and initial stiffnesses of shaft and base of a ...
In the literature, various "failure criteria" or methods of estimating the failure load in pile load...
A new method was established to estimate the ultimate load, which is utilized in the assessment of p...
A new method for the evaluation of the ultimate load of piles by tests not carried to failure is pro...
A new method for the evaluation of the ultimate load of piles by tests not carried to failure is pro...
The precise prediction of maximum load carrying capacity of bored piles is a complex problem because...
The pile’s ultimate capacity or failure load must be computed by some criteria using load-settlement...
None of numerous previous methods for predicting pile capacity is known how accurate any of them are...
Pile load tests cost generally about Rs.200,000/- and are included in almost all major bridge Projec...
Pile is one of many solutions in foundation engineering practice. Buildings supported on piles were ...
This study focuses on how one can possibly predict the ultimate load for the piles that did not reac...
Prediction of pile capacity is performed, however, the statistical analyses and evaluation of the pr...
Testing of bored piles is carried out to investigate the load-settlement behavior of the tested pile...
This paper presents the analysis of static load tests that is carried out on axially loaded piles in...
The objectives ofthis project is to compare various method of bearing capacity determination (analy...
This study aims to estimate the ultimate resistances and initial stiffnesses of shaft and base of a ...
In the literature, various "failure criteria" or methods of estimating the failure load in pile load...