The research investigated the production of Biohythane in a two-phase anaerobic digestion process treating food waste as substrate. Preliminary batch assays were carried out at initial organic loadings of 15, 20, 25 and 30 kg TVS m-3, in stirred 1.5-l reactors at 55 °C. The results showed all hydrogen was produced within the first 24 h after feeding and the highest load tested gave the maximum hydrogen production (0.047 m3 H2 kg-1VS, H2 30%). Similar loadings were then tested in a two-phase system. Hydraulic retention times of 3 and 12 days were applied to the first and second reactor respectively. In order to keep the pH at ∼5.5, either supernatant or whole digestate from the methanogenic reactor was recirculated to the first phase. Result...