The thesis deals with the project of the construction of the Temelin Nuclear Power Plant, as an optimal new production source of electrical energy to ensure the majority of the coverage of the growing electric consumption in the Czech Republic and to ensure the state energy independence in the future. The main part of the thesis is dedicated to the methods of strategic investments evaluation. Emphasis is placed on the dynamic methods, which are also working with the factors of time and risk, which are relevant in this case, because the project time horizon is 70 years. The investment project is evaluated from the perspective of owners, as well as from the overall perspective of owners and creditors. The Monte-Carlo method was implemented in...