The Ministry of Transportation of Ontario (MTO) was interested in a rehabilitation strategy that could be used to address deep-seated rutting issues encountered on its 400-series highways. A precast concrete inlay panel (PCIP) rehabilitation design was developed and constructed involving the installation of precast panels into partially-milled asphalt pavement. Sub-surface instrumentation was installed at the PCIP-asphalt interface including earth pressure cells (EPCs) and moisture sensors installed in six instrumentation clusters. This instrumentation has been monitored to gather information regarding the PCIP trial installation. Readings from the moisture sensors indicate that water penetrates beneath the PCIPs in precipitation events,...