The divertor area of ITER Vacuum Vessel (VV) consists of 54 modular cassettes which must be replaced three times during the estimated 20 years of operation of the ITER. Cassette Multifunctional Mover (CMM) and Cassette Toroidal Mover (CTM) are used in the cassette remote handling (RH).In this paper we discuss the design and development process for the RH equipment to be used in the ITER environment. Design concepts for the Standard Cassette End-Effector and Central Cassette End-Effector are described and the conceptual design phase methodology is presented.The main improvements of the new End-Effector concept designs are more robust and reliable assembly process with reduced CMM mover assembly accuracy requirement. New Central Cassette lock...
A key ITER maintenance activity is the exchange of the divertor cassettes. The current major step in...
Continuing ITER divertor second cassette (SC) remote handling (RH) test campaign has been carried ou...
The Cassette Multi-functional Mover (CMM) is designed for performing safety-critical divertor casset...
A full scale physical development and test facility, Divertor Test Platform 2 (DTP2), has been estab...
A key ITER maintenance activity is the complete exchange of the divertor system at scheduled interva...
The paper describes a concept design of a remote handling (RH) system for replacing divertor cassett...
The paper describes a concept design of a remote handling (RH) system for replacing divertor cassett...
This paper is based on the remote maintenance system project (WPRM) for the demonstration fusion pow...
The paper presents a concept design of a remote handling (RH) system oriented to maintenance operati...
The paper presents a concept design of a Remote Handling (RH) system oriented to maintenance operati...
A key ITER maintenance activity is the exchange of the divertor cassettes. One of the major focuses ...
The divertor area of ITER vacuum vessel consists of 54 modular cassettes which must be exchanged aft...
Engineering Development is one stage from the huge development method called Systems Engineering. In...
A full scale physical test facility, DTP2 (Divertor Test Platform 2) has been established in Finland...
A key ITER maintenance activity is the exchange of the divertor cassettes. The current major step in...
Continuing ITER divertor second cassette (SC) remote handling (RH) test campaign has been carried ou...
The Cassette Multi-functional Mover (CMM) is designed for performing safety-critical divertor casset...
A full scale physical development and test facility, Divertor Test Platform 2 (DTP2), has been estab...
A key ITER maintenance activity is the complete exchange of the divertor system at scheduled interva...
The paper describes a concept design of a remote handling (RH) system for replacing divertor cassett...
The paper describes a concept design of a remote handling (RH) system for replacing divertor cassett...
This paper is based on the remote maintenance system project (WPRM) for the demonstration fusion pow...
The paper presents a concept design of a remote handling (RH) system oriented to maintenance operati...
The paper presents a concept design of a Remote Handling (RH) system oriented to maintenance operati...
A key ITER maintenance activity is the exchange of the divertor cassettes. One of the major focuses ...
The divertor area of ITER vacuum vessel consists of 54 modular cassettes which must be exchanged aft...
Engineering Development is one stage from the huge development method called Systems Engineering. In...
A full scale physical test facility, DTP2 (Divertor Test Platform 2) has been established in Finland...
A key ITER maintenance activity is the exchange of the divertor cassettes. The current major step in...
Continuing ITER divertor second cassette (SC) remote handling (RH) test campaign has been carried ou...
The Cassette Multi-functional Mover (CMM) is designed for performing safety-critical divertor casset...