The Line 9 of Barcelona Metro is currently under construction. The southern part of the line connects the city to the airport and is completely excavated in soft deltaic deposits of Holocene age. In this part, tunnelling is performed by two EPB machines of 9.4 m diameter. The paper first describes the specific geology of the area. Information derived from the excavation of this part of Line 9 is presented and reviewed. In particular, the following issues are addressed: history of volume loss distribution along the line, magnitude and shape of subsidence troughs, influence of pressures used during tunnelling on observed movements, and contributing causes to observed instances of larger ground movements. The paper may constitute a useful case...
Abstract: Nanjing Metro No.1 line is 16.92 km in total length, of which 6.11 km is above ground leve...
The paper describes a case history -related to the Line 9 excavation in Barcelonawhere compensation ...
One of the main causes of problems during the construction of tunnels with tunnel boring machines (T...
The Line 9 of Barcelona Metro is currently under construction. The southern part of the line connect...
Tunnels for the new Barcelona Metro Line 9 are being constructed in a densely built urban area, clos...
The progressive increment in urban tunneling may generate significant problems. One of the main con...
The existence of a layer of hard boulders up to 1 m in size within the soft sediments of the Holocen...
Some of the details of EPB tunnelling are difficult to introduce in conventional numerical models, n...
The paper presents the field monitoring data and a three-dimensional finite-element analysis aiming ...
The paper refers to the methods adopted for building a high-speed railway tunnel system between Bolo...
The paper refers to the methods adopted for building a high-speed railway tunnel system between Bolo...
The paper refers to the methods adopted for building a high-speed railway tunnel system between Bolo...
This paper summarizes the main observations related to geotechnical properties and tool changes that...
A part of Toulouse’s underground line B has been excavated by a 7.8 meters diameter earth-pressure b...
Line 9 of the underground railway is currently being constructed in Barcelona. This undertaking nece...
Abstract: Nanjing Metro No.1 line is 16.92 km in total length, of which 6.11 km is above ground leve...
The paper describes a case history -related to the Line 9 excavation in Barcelonawhere compensation ...
One of the main causes of problems during the construction of tunnels with tunnel boring machines (T...
The Line 9 of Barcelona Metro is currently under construction. The southern part of the line connect...
Tunnels for the new Barcelona Metro Line 9 are being constructed in a densely built urban area, clos...
The progressive increment in urban tunneling may generate significant problems. One of the main con...
The existence of a layer of hard boulders up to 1 m in size within the soft sediments of the Holocen...
Some of the details of EPB tunnelling are difficult to introduce in conventional numerical models, n...
The paper presents the field monitoring data and a three-dimensional finite-element analysis aiming ...
The paper refers to the methods adopted for building a high-speed railway tunnel system between Bolo...
The paper refers to the methods adopted for building a high-speed railway tunnel system between Bolo...
The paper refers to the methods adopted for building a high-speed railway tunnel system between Bolo...
This paper summarizes the main observations related to geotechnical properties and tool changes that...
A part of Toulouse’s underground line B has been excavated by a 7.8 meters diameter earth-pressure b...
Line 9 of the underground railway is currently being constructed in Barcelona. This undertaking nece...
Abstract: Nanjing Metro No.1 line is 16.92 km in total length, of which 6.11 km is above ground leve...
The paper describes a case history -related to the Line 9 excavation in Barcelonawhere compensation ...
One of the main causes of problems during the construction of tunnels with tunnel boring machines (T...