Fr8Rail II/Work-Package 3 Real-time network management and improved methods for timetable planning addresses the problem to improve capacity and punctuality in the railway system by developing concepts and methods for tactical planning and operational traffic. In this report the state-of-the-art has been summarised. The aim of the project is to: Propose concepts and methods that improve the annual and short-term timetable planning. Demonstrate how the proposed timetable planning concepts improve the prerequisites for real-time network management. Develop methods and tools that can reduce inefficiencies in real time network management. An important aspect is to improve the coordination between yards/terminals and the line network, and betwe...
A standard practice to improve punctuality of railway services is the addition of time reserves in t...
A Railway Traffic Management problem can be defined as forecasting fu- ture progression of trains, i...
This paper concentrates on organising, planning and managing the train movement in a network. The th...
Fr8Rail II/Work-Package 3 Real-time network management and improved methods for timetable planning a...
Traffic controllers monitor railway traffic sequencing train movements and setting routes with the a...
The paper discusses the current state of research concerning railway network timetabling and traffic...
This project is concerned with how to improve the capacity allocation process. In particular the pro...
In this report we outline a conceptual demonstrator for advanced real time network management for fr...
Railway is an important and sustainable transportation mode, which despite good potentials results i...
In ARCC project work package 3, research and innovation activities have been done to identify areas ...
This article tackles the real-world planning problem of railway operations. Improving the timetable ...
A railway timetable is typically planned one year in advance, but may be revised several times prior...
Due to high demand and capacity consumption, railway timetables are often sensitive to disturbances....
A standard practice to improve punctuality of railway services is the addition of time reserves in t...
A Railway Traffic Management problem can be defined as forecasting fu- ture progression of trains, i...
This paper concentrates on organising, planning and managing the train movement in a network. The th...
Fr8Rail II/Work-Package 3 Real-time network management and improved methods for timetable planning a...
Traffic controllers monitor railway traffic sequencing train movements and setting routes with the a...
The paper discusses the current state of research concerning railway network timetabling and traffic...
This project is concerned with how to improve the capacity allocation process. In particular the pro...
In this report we outline a conceptual demonstrator for advanced real time network management for fr...
Railway is an important and sustainable transportation mode, which despite good potentials results i...
In ARCC project work package 3, research and innovation activities have been done to identify areas ...
This article tackles the real-world planning problem of railway operations. Improving the timetable ...
A railway timetable is typically planned one year in advance, but may be revised several times prior...
Due to high demand and capacity consumption, railway timetables are often sensitive to disturbances....
A standard practice to improve punctuality of railway services is the addition of time reserves in t...
A Railway Traffic Management problem can be defined as forecasting fu- ture progression of trains, i...
This paper concentrates on organising, planning and managing the train movement in a network. The th...