In this paper we propose a new lower bound for the resource constrained project scheduling problem with generalized precedence relationships. The lower bound is based on a relaxation of the resource constraints among independent activities and on a solution of the relaxed problem suitably represented by means of an AON acyclic network. Computational results are presented and confirmed a better practical performance of the proposed method with respect to the those present in the literatur
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
International audienceThe Resource Constrained Project Scheduling Problem is one of the most intensi...
In this paper we study the Resource Constrained Project Scheduling Problem (RCPSP) with "Feeding Pre...
In this paper we propose a new lower bound for the resource constrained project scheduling problem w...
In this paper we propose a new lower bound for the resource-constrained project scheduling problem w...
This Report has been submitted for publication and will be copyrighted if accepted for publication
It is known that the resource-unconstrained project scheduling problem with generalized precedence c...
We present an optimal solution procedure for the resource-constrained project scheduling problem (RC...
Project scheduling under the assumption of renewable resource constraints and generalized precedence...
In a previous paper (De Reyck and Herroelen, 1996a), we presented an optimal procedure for the resou...
In this paper we propose an exact algorithm for the Resource Constrained Project Scheduling Problem ...
MasterAs the size and complexity of the project increased in project management tasks, scheduling wi...
A survey on solution techniques for the resource-constrained project scheduling problem (RCPSP) with...
In this paper we tackle the challenging problem of scheduling project activities to minimize the pro...
In this paper, we study the resource-constrained project scheduling problem (RCPSP) with discounted ...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
International audienceThe Resource Constrained Project Scheduling Problem is one of the most intensi...
In this paper we study the Resource Constrained Project Scheduling Problem (RCPSP) with "Feeding Pre...
In this paper we propose a new lower bound for the resource constrained project scheduling problem w...
In this paper we propose a new lower bound for the resource-constrained project scheduling problem w...
This Report has been submitted for publication and will be copyrighted if accepted for publication
It is known that the resource-unconstrained project scheduling problem with generalized precedence c...
We present an optimal solution procedure for the resource-constrained project scheduling problem (RC...
Project scheduling under the assumption of renewable resource constraints and generalized precedence...
In a previous paper (De Reyck and Herroelen, 1996a), we presented an optimal procedure for the resou...
In this paper we propose an exact algorithm for the Resource Constrained Project Scheduling Problem ...
MasterAs the size and complexity of the project increased in project management tasks, scheduling wi...
A survey on solution techniques for the resource-constrained project scheduling problem (RCPSP) with...
In this paper we tackle the challenging problem of scheduling project activities to minimize the pro...
In this paper, we study the resource-constrained project scheduling problem (RCPSP) with discounted ...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
International audienceThe Resource Constrained Project Scheduling Problem is one of the most intensi...
In this paper we study the Resource Constrained Project Scheduling Problem (RCPSP) with "Feeding Pre...