A temporary concrete median barrier (CMB) was designed and tested for compliance under the Test Level 3 (TL-3) guidelines specified in the Recommended Procedures for the Safety Performance Evaluation of Highway Features, National Cooperative Highway Research Program (NCHRP) Report No. 350. The barrier is built to the new metric standards and has a traditional pin and loop configuration for interconnection. The objective of this research project was to develop and evaluate a standardized, temporary concrete barrier design while addressing the concerns for safety, economy, structural integrity, constructability, ease of installation, and maintenance. The resulting F-shape barrier segment is 3,800-mm long, a length that reduced the number of c...
PDFTech ReportTRP-03-300-14Work zone traffic controlTemporary barriersGuardrailsSimulationHighway sa...
Manitoba Infrastructure (MI) desired a new, tall concrete median barrier capable of satisfying the T...
2002PDFTech ReportTRP-03-115-02RPFP-01-06Barriers (Roads)TiedownsWork zonesTemporary barriersConcret...
A temporary concrete median barrier (CMB) was designed and tested for compliance under the Test Leve...
The objective of this research was to design a transition from temporary concrete barriers to a perm...
11546762009Final ReportPDFTech ReportTRP-03-209-09SPR-3 (017)AnchoragesBarriers (Roads)ConcreteCrash...
665069915Final report.PDFTech ReportFHWA/OH-2006/16134162Barriers (Roads)New JerseyBattelle Memorial...
"June 2006."; Includes bibliographical references (leaf 80).; Final report.; Performed by Battelle M...
009648952003Final ReportPDFTech ReportRPFP-03-06TRP-03-134-03SPR-3(017)Highway safetyTemporary barri...
10995642010Final ReportPDFTech ReportTRP-03-194-07SPR-3(017)Highway safetyMedian barriersBarriers (R...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
Often, temporary barriers are used in applications where it is desired that their deflection during ...
Temporary concrete barrier (TCB) systems are utilized in many circumstances, including for placement...
https://doi.org/10.21949/15181562003PDFTech ReportFHWA/MT-03-002/81628162Barriers (Roads)Median barr...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
PDFTech ReportTRP-03-300-14Work zone traffic controlTemporary barriersGuardrailsSimulationHighway sa...
Manitoba Infrastructure (MI) desired a new, tall concrete median barrier capable of satisfying the T...
2002PDFTech ReportTRP-03-115-02RPFP-01-06Barriers (Roads)TiedownsWork zonesTemporary barriersConcret...
A temporary concrete median barrier (CMB) was designed and tested for compliance under the Test Leve...
The objective of this research was to design a transition from temporary concrete barriers to a perm...
11546762009Final ReportPDFTech ReportTRP-03-209-09SPR-3 (017)AnchoragesBarriers (Roads)ConcreteCrash...
665069915Final report.PDFTech ReportFHWA/OH-2006/16134162Barriers (Roads)New JerseyBattelle Memorial...
"June 2006."; Includes bibliographical references (leaf 80).; Final report.; Performed by Battelle M...
009648952003Final ReportPDFTech ReportRPFP-03-06TRP-03-134-03SPR-3(017)Highway safetyTemporary barri...
10995642010Final ReportPDFTech ReportTRP-03-194-07SPR-3(017)Highway safetyMedian barriersBarriers (R...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
Often, temporary barriers are used in applications where it is desired that their deflection during ...
Temporary concrete barrier (TCB) systems are utilized in many circumstances, including for placement...
https://doi.org/10.21949/15181562003PDFTech ReportFHWA/MT-03-002/81628162Barriers (Roads)Median barr...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
PDFTech ReportTRP-03-300-14Work zone traffic controlTemporary barriersGuardrailsSimulationHighway sa...
Manitoba Infrastructure (MI) desired a new, tall concrete median barrier capable of satisfying the T...
2002PDFTech ReportTRP-03-115-02RPFP-01-06Barriers (Roads)TiedownsWork zonesTemporary barriersConcret...