In mixed-model assembly lines, smooth operation of the assembly line depends on adherence to the scheduled sequence. However, during production process, this sequence is altered both intentionally and uninstentionally. A major source of unintentional sequence alteration in automobile plants is the paint defects. A post-paint resequencing buffer, located before the final assembly is used to restore the altered sequence. Restoring the altered sequence back to the scheduled sequence requires three distinct operations in this buffer: Changing the positions (i.e. resequencing) of vehicles, inserting spare vehicles in between difficult models and replacing spare vehicles with paint defective vehicles. We develop a two-stage stochastic model to de...
The allocation of buffers between workstations is a major optimization problem faced by manufacturin...
In the last decades, the necessity to make production more versatile and flexible has forced assembl...
Inventory space requirements in remanufacturing facilities can vary significantly over time and by t...
Abstract This study considers instant decision-making needs of the automobile manufactures for reseq...
The paper presents a Car Sequencing Problem, widely considered in the literature. The issue consider...
A variety of optimization formulations have been proposed for mixed-model assembly sequencing proble...
The car sequencing problem determines sequences of different car models launched down a mixed-model ...
Probabilistic processing times, times between breakdowns and repair times make the amount of stock i...
In production control with a stable order sequence, the assembly order is fixed in the form of the s...
In this paper we examine the various effects that workstations and rework loops with identical paral...
A selecting appropriate buffer sizes for the assembly system is a complex task that must account for...
Two-sided assembly lines are often designed to produce large-sized products, such as automobiles, tr...
Assembly line rebalancing is a problem companies are frequently confronted with as continuous change...
We consider a partial disassembly line balancing problem with hazardous tasks whose successful compl...
This paper proposes a simulation-based optimization technique for the design of a retouch line, cons...
The allocation of buffers between workstations is a major optimization problem faced by manufacturin...
In the last decades, the necessity to make production more versatile and flexible has forced assembl...
Inventory space requirements in remanufacturing facilities can vary significantly over time and by t...
Abstract This study considers instant decision-making needs of the automobile manufactures for reseq...
The paper presents a Car Sequencing Problem, widely considered in the literature. The issue consider...
A variety of optimization formulations have been proposed for mixed-model assembly sequencing proble...
The car sequencing problem determines sequences of different car models launched down a mixed-model ...
Probabilistic processing times, times between breakdowns and repair times make the amount of stock i...
In production control with a stable order sequence, the assembly order is fixed in the form of the s...
In this paper we examine the various effects that workstations and rework loops with identical paral...
A selecting appropriate buffer sizes for the assembly system is a complex task that must account for...
Two-sided assembly lines are often designed to produce large-sized products, such as automobiles, tr...
Assembly line rebalancing is a problem companies are frequently confronted with as continuous change...
We consider a partial disassembly line balancing problem with hazardous tasks whose successful compl...
This paper proposes a simulation-based optimization technique for the design of a retouch line, cons...
The allocation of buffers between workstations is a major optimization problem faced by manufacturin...
In the last decades, the necessity to make production more versatile and flexible has forced assembl...
Inventory space requirements in remanufacturing facilities can vary significantly over time and by t...