This report summarizes the results of the backup activity performed after cancellation of the MD1787. This MD was originally conceived to measure the instability growth rate versus chromaticity and damper settings at injections energy in the LHC, but, due to an RFQ issue in the Linac2 followed by an issue with the LHC cryogenic system, the original plan could not be executed. As a short backup activity on the available time given by the daylight saving on 30th October 2016 and the kind cooperation with other LHC MD users, it was decided to characterize with beam the TDI impedance
This note summarizes three inter-related machine development sessions that were performed in the LHC...
During the re-commissioning phase of the LHC after the long shutdown 1 very high beam losses were ob...
Since the LHC started operation, some unknown source is causing an interference in the beams, leadin...
This note summarises the MD3310 activity. The goal was to measure the complex tune shift as a functi...
This report summarises the results of MD1875 about impedance measurements of single LHCsecondary co...
This report summarises the results of MD3318 about impedance measurements of individual LHC secondar...
The tune of the Large Hadron Collider (LHC) mainly depends on the strength of the quadrupole magnets...
After two years of shutdown, the Large Hadron Collider (LHC) has been operated in 2015 at 6.5 TeV, c...
This MD note summarizes the measurements performed to study persistent longitudinal oscillations aft...
The main purpose of this MD was to study longitudinal and transverse beam dynamics in the LHC. Eight...
The aim of the MD was to measure the coupled-bunch stability from all HOM impedances, with a reduced...
This note gives a short summary of the MD on transverse coupled-bunch instabilities together with a ...
The Large Hadron Collider (LHC) is the largest accelerator in the world and it will collide opposing...
The base-line scenario for the High-Luminosity LHC upgrade foresees an intensity increase delivered ...
The LHC collimation system is a critical element for the safe operation of the LHC machine and is su...
This note summarizes three inter-related machine development sessions that were performed in the LHC...
During the re-commissioning phase of the LHC after the long shutdown 1 very high beam losses were ob...
Since the LHC started operation, some unknown source is causing an interference in the beams, leadin...
This note summarises the MD3310 activity. The goal was to measure the complex tune shift as a functi...
This report summarises the results of MD1875 about impedance measurements of single LHCsecondary co...
This report summarises the results of MD3318 about impedance measurements of individual LHC secondar...
The tune of the Large Hadron Collider (LHC) mainly depends on the strength of the quadrupole magnets...
After two years of shutdown, the Large Hadron Collider (LHC) has been operated in 2015 at 6.5 TeV, c...
This MD note summarizes the measurements performed to study persistent longitudinal oscillations aft...
The main purpose of this MD was to study longitudinal and transverse beam dynamics in the LHC. Eight...
The aim of the MD was to measure the coupled-bunch stability from all HOM impedances, with a reduced...
This note gives a short summary of the MD on transverse coupled-bunch instabilities together with a ...
The Large Hadron Collider (LHC) is the largest accelerator in the world and it will collide opposing...
The base-line scenario for the High-Luminosity LHC upgrade foresees an intensity increase delivered ...
The LHC collimation system is a critical element for the safe operation of the LHC machine and is su...
This note summarizes three inter-related machine development sessions that were performed in the LHC...
During the re-commissioning phase of the LHC after the long shutdown 1 very high beam losses were ob...
Since the LHC started operation, some unknown source is causing an interference in the beams, leadin...