In 2020, after the CERN accelerators complex Long Shutdown 2 (LS2), a novel Linac4 (L4)-to-PS Booster (PSB) charge-exchange injection system will allow to transform the L4 160 MeV H$^-$ beam into H$^+$, which will be injected into the four PSB superposed rings. For this, a 200 µg/cm$^2$ carbon stripping foil will convert negative hydrogen ions (H$^-$) into protons by stripping off the electrons. L4 is now performing operational reliability runs, which include a stripping foil test stand installed in the L4 transfer line. These tests will permit to gain experience on the fragile foils, test different foil materials and thicknesses, measure the efficiency and lifetime of the foils, and evaluate the foil changing mechanism as well as the inter...
Beam physics considerations for the stripping foil of the 160 MeV PSB H- injection systems are descr...
In the scope of an upgrade of the injector chain of CERN’s accelerator complex, a new linear acceler...
Linac4 is a normal conducting, 160 MeV H- ion accelerator that is being constructed within the scope...
In 2020, after the CERN accelerators complex Long Shutdown 2 (LS2), a novel Linac4 (L4)-to-PS Booste...
The 160 MeV H− beam from the Linac4 (L4) linear accelerator at CERN will be injected into the Proton...
The 160 MeV H− beam from the Linac4 (L4) linear accelerator at CERN will be injected into the proton...
During the Long Shutdown 2 (LS2) at CERN, the new Linac4 (L4) accelerator will be connected to the P...
During the Long Shutdown 2 (LS2) at CERN, the new Linac4 (L4) accelerator will be connected to the P...
The PSB will be extensively upgraded during the next long shutdown of the CERN accelerator complex, ...
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) wil...
For CERN's Linac4 (L4) Proton Synchrotron Booster (PSB) injection scheme, slices of the 160 MeV H⁻ b...
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will under...
Beam physics considerations for the stripping foil of the PSB H- injection system are described, inc...
Linac4 is the new H- linear accelerator under construction at CERN aiming to double the brightness o...
Linac4 will be the new linear accelerator of the CERN accelerator chain delivering H- ions at 160 Me...
Beam physics considerations for the stripping foil of the 160 MeV PSB H- injection systems are descr...
In the scope of an upgrade of the injector chain of CERN’s accelerator complex, a new linear acceler...
Linac4 is a normal conducting, 160 MeV H- ion accelerator that is being constructed within the scope...
In 2020, after the CERN accelerators complex Long Shutdown 2 (LS2), a novel Linac4 (L4)-to-PS Booste...
The 160 MeV H− beam from the Linac4 (L4) linear accelerator at CERN will be injected into the Proton...
The 160 MeV H− beam from the Linac4 (L4) linear accelerator at CERN will be injected into the proton...
During the Long Shutdown 2 (LS2) at CERN, the new Linac4 (L4) accelerator will be connected to the P...
During the Long Shutdown 2 (LS2) at CERN, the new Linac4 (L4) accelerator will be connected to the P...
The PSB will be extensively upgraded during the next long shutdown of the CERN accelerator complex, ...
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) wil...
For CERN's Linac4 (L4) Proton Synchrotron Booster (PSB) injection scheme, slices of the 160 MeV H⁻ b...
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will under...
Beam physics considerations for the stripping foil of the PSB H- injection system are described, inc...
Linac4 is the new H- linear accelerator under construction at CERN aiming to double the brightness o...
Linac4 will be the new linear accelerator of the CERN accelerator chain delivering H- ions at 160 Me...
Beam physics considerations for the stripping foil of the 160 MeV PSB H- injection systems are descr...
In the scope of an upgrade of the injector chain of CERN’s accelerator complex, a new linear acceler...
Linac4 is a normal conducting, 160 MeV H- ion accelerator that is being constructed within the scope...