The integration of construction planning and scheduling into Building Information Modeling (BIM) workflows is still evolving. The common workflow to integrate the fourth dimensional (4D) of BIM still relies on the ability of manually linking construction activity tasks with 3D BIM-based objects. This process is arduous and requires high levels of accuracy and strong communication between design and construction trades. Identifying the corresponding objects and its tasks could even be a more complex process in large projects. Although this 4D BIM procedure tends to be troublesome, the benefits of completing it are various: project visualization, project monitoring and controls, construction safety, etc. Different efforts for leveraging its u...
2D drawings are commonly being used to present the work process of 3D objects in the construction in...
Building Information Modeling (BIM) is a digital representation of the building process to facilitat...
With the rapid development of the construction industry and computational technology, the digital de...
The integration of construction planning and scheduling into Building Information Modeling (BIM) wor...
Lack of adequate visualization of project construction operations often causes project parties to st...
Visualization of construction schedules has much improved through the development of 4D modeling too...
The architecture, engineering and construction (AEC) industry is shifting from 2D CAD drawings to mo...
Visualization of construction schedules has much improved through the development of 4D modeling too...
The aim of this paper is to discuss and explain key concepts in new generation Project management so...
Building Information Modelling (BIM) is now a globally recognised phenomenon, though its adoption re...
Construction activities scheduling can be seen as the backbone process of any construction project t...
Construction planning and scheduling are vital to ensure delivering the project according to the agr...
Building InformationModelling (BIM) can be defined as a set of tools, processes and technologies tha...
The planning and scheduling of construction projects depends on technological and temporal constrain...
Traditional construction planning and performance control tools such as Gantt Charts and S Curves fa...
2D drawings are commonly being used to present the work process of 3D objects in the construction in...
Building Information Modeling (BIM) is a digital representation of the building process to facilitat...
With the rapid development of the construction industry and computational technology, the digital de...
The integration of construction planning and scheduling into Building Information Modeling (BIM) wor...
Lack of adequate visualization of project construction operations often causes project parties to st...
Visualization of construction schedules has much improved through the development of 4D modeling too...
The architecture, engineering and construction (AEC) industry is shifting from 2D CAD drawings to mo...
Visualization of construction schedules has much improved through the development of 4D modeling too...
The aim of this paper is to discuss and explain key concepts in new generation Project management so...
Building Information Modelling (BIM) is now a globally recognised phenomenon, though its adoption re...
Construction activities scheduling can be seen as the backbone process of any construction project t...
Construction planning and scheduling are vital to ensure delivering the project according to the agr...
Building InformationModelling (BIM) can be defined as a set of tools, processes and technologies tha...
The planning and scheduling of construction projects depends on technological and temporal constrain...
Traditional construction planning and performance control tools such as Gantt Charts and S Curves fa...
2D drawings are commonly being used to present the work process of 3D objects in the construction in...
Building Information Modeling (BIM) is a digital representation of the building process to facilitat...
With the rapid development of the construction industry and computational technology, the digital de...