Foundation Stone Laying for St. Luke\u27s new facility. April 18, 1993

Publication date
April 1993
Publisher
Information Bulletin on Variable Stars (IBVS)

Abstract

Although the new church building was not yet completed. the members of St. Luke\u27s were allowed limited access in order to have a ceremony as the Foundation Stone was laid in the new narthex area. Participating in the ceremony were (l-r): Richard (Dick) Sawyer, President of the congregation; Rev. Albert Marcis, President of the SELC District; Rev. Dr. Glenn O\u27Shoney, Executive Director of the LCMS Board for Mission Services and Rev. E. J. Rossow, pastor of St. Luke\u27s. Four time capsules (8 diameter PVC tubes) had been filled with mementos, historical documents and letters meant to be read by future generations, then sealed and placed into a concrete container under the floor. After the brief ceremony, the marble capstone (aka f...

Extracted data

Related items

Foundation Stone Laying for St. Luke\u27s new facility. April 18, 1993
April 1993

Although the new church building was not yet completed. the members of St. Luke\u27s were allowed li...

Foundation Stone Laying in narthex of St. Luke\u27s 1993 facility. April 18, 1993
April 1993

Seven months before St. Luke\u27s congregation had received a Certificate of Occupancy and was able ...

Groundbreaking for construction of new church. June 2,1991
June 1991

Following the 10AM worship service on June 2, 1991, St. Luke\u27s congregation gathered outside, nea...