The cost of pile foundations is part of the super structure cost, and it became necessary to reduce this cost by studying the pile types then decision-making in the selection of the optimal pile type in terms of cost and time of production and quality .So The main objective of this study is to solve the time–cost–quality trade-off (TCQT) problem by finding an optimal pile type with the target of "minimizing" cost and time while "maximizing" quality. There are many types In the world of piles but in this paper, the researcher proposed five pile types, one of them is not a traditional, and developed a model for the problem and then employed particle swarm optimization (PSO) algorithm, as one of evolutionary algorithms with the help of (Mat...
Friction capacity is a principal characteristic in designing driven piles. Considering the complexit...
The full potential of pile optimization has not been realized as the interactions between superstruc...
Time, cost and quality are three factors playing an important role in the planning and controlling o...
To reduce the differential settlement of pile group foundations, a squeezed-branch pile group optimi...
This paper presents an automated optimal design method using a hybrid genetic algorithm for pile gro...
An automated optimal design method using hybrid genetic algorithm (GA) is developed for pile group f...
Pile reuse has become an increasingly popular option in foundation design, mainly due to its potenti...
Intensive heuristic and metaheuristic research efforts have focused on the Pareto front optimization...
99學年度楊立人研究獎補助論文[[abstract]]Optimization of construction time helps practitioners save time and money...
Numerous alternatives exist for foundation systems and construction technologies. The systems can be...
Prediction of pile bearing capacity has been considered an unsolved problem for years. This study pr...
Reduction in construction project duration is generally linked to additional cost due to more expens...
AbstractGiven the importance of pile foundations in geotechnical engineering for supporting high-sig...
Contractor selection plays a vital role in project management, where factors such as cost, quality, ...
In order to address optimization problems, artificial intelligence (AI) is employed in the construct...
Friction capacity is a principal characteristic in designing driven piles. Considering the complexit...
The full potential of pile optimization has not been realized as the interactions between superstruc...
Time, cost and quality are three factors playing an important role in the planning and controlling o...
To reduce the differential settlement of pile group foundations, a squeezed-branch pile group optimi...
This paper presents an automated optimal design method using a hybrid genetic algorithm for pile gro...
An automated optimal design method using hybrid genetic algorithm (GA) is developed for pile group f...
Pile reuse has become an increasingly popular option in foundation design, mainly due to its potenti...
Intensive heuristic and metaheuristic research efforts have focused on the Pareto front optimization...
99學年度楊立人研究獎補助論文[[abstract]]Optimization of construction time helps practitioners save time and money...
Numerous alternatives exist for foundation systems and construction technologies. The systems can be...
Prediction of pile bearing capacity has been considered an unsolved problem for years. This study pr...
Reduction in construction project duration is generally linked to additional cost due to more expens...
AbstractGiven the importance of pile foundations in geotechnical engineering for supporting high-sig...
Contractor selection plays a vital role in project management, where factors such as cost, quality, ...
In order to address optimization problems, artificial intelligence (AI) is employed in the construct...
Friction capacity is a principal characteristic in designing driven piles. Considering the complexit...
The full potential of pile optimization has not been realized as the interactions between superstruc...
Time, cost and quality are three factors playing an important role in the planning and controlling o...