The Large Hadron Collider (LHC) completed its Run-2 operation period from 2015 through 2018, which delivered an integrated luminosity of 156~fb$^{-1}$ at a centre-of-mass $pp$ collision energy of 13~TeV. This marked ten years of successful operation of the ATLAS Semiconductor Tracker (SCT), which operated during Run 2 with instantaneous luminosity and pileup conditions that were far in excess of what the SCT was originally designed to meet. Nevertheless, thanks to various improvements on its operation, the SCT achieved high performance with a hit efficiency greater than 99\%. The effects of radiation damage, in particular significant increase of the leakage current and full depletion voltage, were observed during Run 2. Although those may r...
The performance of ATLAS SemiConductor Tracker (SCT) in Run-2 at Large Hadron Collider (LHC) has bee...
The semiconductor tracker (SCT) is one of the tracking systems for charged particles in the ATLAS de...
The semiconductor tracker (SCT) is one of the tracking systems for charged particles in the ATLAS de...
The Large Hadron Collider (LHC) recently completed its Run-2 operation period (2015-2018) which deli...
The performance of ATLAS SemiConductor Tracker (SCT) in Run-2 at Large Hadron Collider (LHC) has bee...
The semiconductor tracker (SCT) is one of the tracking systems for charged particles in the ATLAS de...
The semiconductor tracker (SCT) is one of the tracking systems for charged particles in the ATLAS de...
The Large Hadron Collider (LHC) recently completed its Run-2 operation period (2015-2018) which deli...
The performance of ATLAS SemiConductor Tracker (SCT) in Run-2 at Large Hadron Collider (LHC) has bee...
The semiconductor tracker (SCT) is one of the tracking systems for charged particles in the ATLAS de...
The semiconductor tracker (SCT) is one of the tracking systems for charged particles in the ATLAS de...