Final report.PDFTech ReportFHWA-OK-08-02ODOT Reference 3459014260ODOT Job Piece 01946(48)Road constructionContractsContract administrationContractingTimeComputer programsSoftwareOklahomaOklahoma. Dept of TransportationJeong, Hyung SeokOberlender, Garold D.Atreya, SiddharthAkella, VenkateshOklahoma State University. School of Civil & Environmental EngineeringOklahoma. Dept. of Transportation. Planning & Research DivisionNTL-PLANNING AND POLICY-PLANNING AND POLICYNTL-ECONOMICS AND FINANCE-ECONOMICS AND FINANCEUS Transportation CollectionPhase I of this study was funded by OTC and was successfully completed in December 2006
The Federal Highway Administration requires State Transportation Agencies to have a formal method to...
This paper describes a process for estimating the construction contract time for highway projects. T...
History has shown that projects move in and out of poor status through the life of the project. Pred...
Phase I of this study was funded by OTC and was successfully completed in December, 2006. In phase I...
This paper reports on the results of research that was funded by the Kentucky Transportation Cabinet...
PDFTech Report29694-7SSContract ratesSoftwareContract administrationConstructionQuality controlPrequ...
814060PDFResearch PaperContractsRoad constructionKentuckyHancher, Donn E.Werkmeister Jr., Raymond F....
Contract time, is the maximum time allowed for completion of all work described in contract document...
In project management, finishing a project on schedule is one of the most important aspects. The Tex...
1. PURPOSE. To provide procedures for determining contract time for construction projects. 2. POLICY...
Production rates are significantly important for contract time determination procedures as these are...
PDFTech Report296Contract administrationContractingProceduresLouisianaLouisiana Transportation Resea...
US Transportation Collection2020PDFTech ReportJentink, RossBossert, JustinJones, HeatherWSB & Associ...
To provide guidelines for determining contract time on all construction projects. Policy Effective J...
Poor estimates of project contract completion time can produce dire consequences. Awarding too much ...
The Federal Highway Administration requires State Transportation Agencies to have a formal method to...
This paper describes a process for estimating the construction contract time for highway projects. T...
History has shown that projects move in and out of poor status through the life of the project. Pred...
Phase I of this study was funded by OTC and was successfully completed in December, 2006. In phase I...
This paper reports on the results of research that was funded by the Kentucky Transportation Cabinet...
PDFTech Report29694-7SSContract ratesSoftwareContract administrationConstructionQuality controlPrequ...
814060PDFResearch PaperContractsRoad constructionKentuckyHancher, Donn E.Werkmeister Jr., Raymond F....
Contract time, is the maximum time allowed for completion of all work described in contract document...
In project management, finishing a project on schedule is one of the most important aspects. The Tex...
1. PURPOSE. To provide procedures for determining contract time for construction projects. 2. POLICY...
Production rates are significantly important for contract time determination procedures as these are...
PDFTech Report296Contract administrationContractingProceduresLouisianaLouisiana Transportation Resea...
US Transportation Collection2020PDFTech ReportJentink, RossBossert, JustinJones, HeatherWSB & Associ...
To provide guidelines for determining contract time on all construction projects. Policy Effective J...
Poor estimates of project contract completion time can produce dire consequences. Awarding too much ...
The Federal Highway Administration requires State Transportation Agencies to have a formal method to...
This paper describes a process for estimating the construction contract time for highway projects. T...
History has shown that projects move in and out of poor status through the life of the project. Pred...