PDFTech ReportDOT-FH-11-8876PatchingPavement maintenancePortland cement concreteBituminous concrete pavementsEvaluationEpoxy coatingsPolymer concreteDurabilityCostsOregonOregon. Dept. of Transportation. Highway DivisionQuinn, William J.Beecroft, GordonOregon. Dept. of Transportation. Highway DivisionUnited States. Federal Highway AdministrationUS Transportation CollectionThis report describes the installation and evaluation of trial pavement patching materials in Oregon. The patches were placed in Portland cement concrete and bituminous concrete pavements and evaluated for periods ranging from four to twelve months.Of the five products used in patching the Portland cement concrete pavement, the epoxy concrete and the acrylic polymer concret...