The work focuses on the feasibility study relating to the design of a new integrated sustainable waste management facility in Ngong town (Kenya), within the Kajiado County; the County borders Nairobi and extends to the Tanzanian border further south. Currently, the waste generated in Ngong town is sent to an illegal dumping site, which must be closed as soon as possible since it is causing serious environmental and social impacts. Specifically, the purpose of the study was to carefully analyze the context, taking into consideration environmental, economic and social aspects, providing technical–economic solutions which must be robust, easy to build, operate and maintain, be cost-effective and self-sustaining from an economic standpoint, and...
Submitted in partial fulfillment of the requirement for award of Degree of Master of Commerce at Str...
The construction industry is established to be responsible for one third of Green House Gas (GHG) em...
A DISSERTATION SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF DEGREE OF MASTER...
The work focuses on the feasibility study relating to the design of a new integrated sustainable was...
This report investigates the possibilities and solutions for a sustainable municipal solid waste man...
The directive to close the dumpsite in Kisumu, Kenya has made the search for alternative solid waste...
The poor state of solid waste management in most of the developing countries is a major threatto pub...
Waste is an eternal burden and is a necessary evil, a tragedy of the commons in waiting. Waste produ...
A Research Project Submitted to the Chandaria School of Business in Partial Fulfillment of the Requi...
This paper reports the results of an investigation into the problems of solid waste operations and d...
The process of allocating necessary resources like clean water, fuel/energy and food have resulted i...
This Bachelor’s Thesis was commissioned by HAMK Sheet Metal Center and is a part of HAMK’s contribut...
Managing solid waste is one of the greatest challenges a city of any size faces regardless of its de...
Municipal solid waste management (MSWM) constitute a serious problem in most cities in the developin...
Abstract: Harare is experiencing enormous solid waste management challenges manifesting themselves i...
Submitted in partial fulfillment of the requirement for award of Degree of Master of Commerce at Str...
The construction industry is established to be responsible for one third of Green House Gas (GHG) em...
A DISSERTATION SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF DEGREE OF MASTER...
The work focuses on the feasibility study relating to the design of a new integrated sustainable was...
This report investigates the possibilities and solutions for a sustainable municipal solid waste man...
The directive to close the dumpsite in Kisumu, Kenya has made the search for alternative solid waste...
The poor state of solid waste management in most of the developing countries is a major threatto pub...
Waste is an eternal burden and is a necessary evil, a tragedy of the commons in waiting. Waste produ...
A Research Project Submitted to the Chandaria School of Business in Partial Fulfillment of the Requi...
This paper reports the results of an investigation into the problems of solid waste operations and d...
The process of allocating necessary resources like clean water, fuel/energy and food have resulted i...
This Bachelor’s Thesis was commissioned by HAMK Sheet Metal Center and is a part of HAMK’s contribut...
Managing solid waste is one of the greatest challenges a city of any size faces regardless of its de...
Municipal solid waste management (MSWM) constitute a serious problem in most cities in the developin...
Abstract: Harare is experiencing enormous solid waste management challenges manifesting themselves i...
Submitted in partial fulfillment of the requirement for award of Degree of Master of Commerce at Str...
The construction industry is established to be responsible for one third of Green House Gas (GHG) em...
A DISSERTATION SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR THE AWARD OF DEGREE OF MASTER...