When contractors provide timely and reliable information on the status of a contract, both contractors and government program offices can provide an accurate estimate of a contract’s completion costs. This research shows that the cumulative cost performance indices provided by contractors and program offices are high and less accurate than those of previous years and/or that a significant amount of ACWP is being documented in the final portion of a contract. The high performance indices resulted in EACs that were low-balled during the majority of a contract’s life which shows a need to improve the use of EVM metrics for effective project and program management. This research replicates Christensen’s findings in 1996 which proved that using ...
This research seeks to achieve two objectives: 1) to provide a comprehensive survey of research rela...
The accuracy of cost estimates is vital during this era of budget constraints. A key component of th...
The optimal level of Government Contract Work Breakdown Structure (G-CWBS) reporting for the purpose...
Government contractors report earned value (EV) information to government agencies in monthly Contra...
According to some authors, an accurate estimate of a contract's completion cost is not always t...
Efficient decision making mandates the accuracy of forecasted estimations of a contract\u27s final v...
Christensen (1999) describes several methods to evaluate the accuracy of the estimated final cost of...
Historically, cost growth regression models analyze aggregate, program-level information. Initiative...
Cost growth is a problem DoD wide. Cost Estimators attempt to remedy this problem by accounting for ...
This thesis examines the impact of the Federal Acquisition Streamlining Act (FASA) of 1994 and the C...
This study is an exploratory analysis combining military construction (MILCON) data from the Selecte...
This article examines the history of cost overruns reported on 64 completed defense contracts. Its p...
Controlling costs in the acquisition of new defense systems is a major challenge in today\u27s envir...
Predicting Estimates at Complete (EAC) for Department of Defense (DoD) space programs has proven to ...
Adjusting fixed price contract prices over long periods of performance is vital to protect both the ...
This research seeks to achieve two objectives: 1) to provide a comprehensive survey of research rela...
The accuracy of cost estimates is vital during this era of budget constraints. A key component of th...
The optimal level of Government Contract Work Breakdown Structure (G-CWBS) reporting for the purpose...
Government contractors report earned value (EV) information to government agencies in monthly Contra...
According to some authors, an accurate estimate of a contract's completion cost is not always t...
Efficient decision making mandates the accuracy of forecasted estimations of a contract\u27s final v...
Christensen (1999) describes several methods to evaluate the accuracy of the estimated final cost of...
Historically, cost growth regression models analyze aggregate, program-level information. Initiative...
Cost growth is a problem DoD wide. Cost Estimators attempt to remedy this problem by accounting for ...
This thesis examines the impact of the Federal Acquisition Streamlining Act (FASA) of 1994 and the C...
This study is an exploratory analysis combining military construction (MILCON) data from the Selecte...
This article examines the history of cost overruns reported on 64 completed defense contracts. Its p...
Controlling costs in the acquisition of new defense systems is a major challenge in today\u27s envir...
Predicting Estimates at Complete (EAC) for Department of Defense (DoD) space programs has proven to ...
Adjusting fixed price contract prices over long periods of performance is vital to protect both the ...
This research seeks to achieve two objectives: 1) to provide a comprehensive survey of research rela...
The accuracy of cost estimates is vital during this era of budget constraints. A key component of th...
The optimal level of Government Contract Work Breakdown Structure (G-CWBS) reporting for the purpose...