Early research on time phasing primarily focuses on the theoretical foundation for applying the continuous distribution function, or S-curve, to model the distribution of development expenditures. Minimal methodology is provided for estimating the S-curve\u27s parameter values. Brown, White, and Gallagher (2002) resolve this shortcoming through regression analysis, but their methodology has not been widely adopted by aircraft cost analysts, as it is judged as overly broad and not specific to aircraft. Instead, analysts commonly apply the 60/40 rule of thumb to aircraft development, assuming 60 percent expenditures at 50 percent schedule. It is currently unknown if the 60/40 heuristic accurately describes contemporary aircraft development pr...
This thesis developed models to forecast the KC-135R monthly Consumables (CONS) and Depot Level Repa...
Weapon System Sustainment (WSS) costs are growing at an increasing rate despite the vast efforts to ...
As military and other governmental budgets decline and impacted project deadline changes require ins...
The goal of this research was to identify which learning curve model is most accurate when applied t...
The purpose of this research was to investigate the flattening effect at tail end of learning curves...
The accuracy of budget estimates is vital in ensuring cost efficiency and decreasing the possibility...
This thesis applies econometric techniques to build a marginal cost per flying hour model for the ...
Past research shows predicting cost growth is an important topic with DoD systems. Researchers have ...
The fiscally constrained environment in which the Air Force executes its mission places great emphas...
This study uses both descriptive and inferential techniques to investigate trends in cost and schedu...
Accurately predicting Operating and Support (O&S) costs is vital in the current climate of budgetary...
Historically, cost growth regression models analyze aggregate, program-level information. Initiative...
This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle f...
The premise of this research is to identify and model modifications to the prescribed learning curve...
This research analyzes operational and programmatic data from all Air National Guard and 13 of 14 ac...
This thesis developed models to forecast the KC-135R monthly Consumables (CONS) and Depot Level Repa...
Weapon System Sustainment (WSS) costs are growing at an increasing rate despite the vast efforts to ...
As military and other governmental budgets decline and impacted project deadline changes require ins...
The goal of this research was to identify which learning curve model is most accurate when applied t...
The purpose of this research was to investigate the flattening effect at tail end of learning curves...
The accuracy of budget estimates is vital in ensuring cost efficiency and decreasing the possibility...
This thesis applies econometric techniques to build a marginal cost per flying hour model for the ...
Past research shows predicting cost growth is an important topic with DoD systems. Researchers have ...
The fiscally constrained environment in which the Air Force executes its mission places great emphas...
This study uses both descriptive and inferential techniques to investigate trends in cost and schedu...
Accurately predicting Operating and Support (O&S) costs is vital in the current climate of budgetary...
Historically, cost growth regression models analyze aggregate, program-level information. Initiative...
This article examines how cost growth factors (CGF) change over a program’s acquisition life cycle f...
The premise of this research is to identify and model modifications to the prescribed learning curve...
This research analyzes operational and programmatic data from all Air National Guard and 13 of 14 ac...
This thesis developed models to forecast the KC-135R monthly Consumables (CONS) and Depot Level Repa...
Weapon System Sustainment (WSS) costs are growing at an increasing rate despite the vast efforts to ...
As military and other governmental budgets decline and impacted project deadline changes require ins...