Power Shovel perched on the ledge of the canyon wall is used to excavate deep 14 foot pits into which anchors of the suspension bridge will be solidly cemented to hold structure. Two such pits will be constructed on each side of the river where anchor rods will be embedded in solid cement. Shovel cleans out pits a material is loosened by blasting and picking
The bridge access road at Flaming Gorge was graded and graveled to make a temporary road leading to ...
The bridge access road at Flaming Gorge was graded and graveled to make a temporary road leading to ...
From above can be seen the tunnel being drilled through the mountain so construction can begin on th...
Power Shovel perched on the ledge of the canyon wall is used to excavate deep 14 foot pits into whic...
Power shovels were used to excavate deep 14 foot pits into which anchors for the suspension bridge w...
Power shovels were used to excavate deep 14 foot pits into which anchors for the suspension bridge w...
Preliminary to the construction of the suspension bridge that will link Vernal with Dutch John a big...
Preliminary to the construction of the suspension bridge that will link Vernal with Dutch John a big...
Power shovels along with other equipment begin work for the suspension bridge that will be construct...
Power shovels along with other equipment begin work for the suspension bridge that will be construct...
Holes were dug and filled with cement to place frames to run these steel cables that supported the s...
Holes were dug and filled with cement to place frames to run these steel cables that supported the s...
The diversion tunnel is a gaping big black hole in the rock ledge at the bottom of Flaming Gorge Can...
The diversion tunnel is a gaping big black hole in the rock ledge at the bottom of Flaming Gorge Can...
Operations at Flaming Gorge damsite. Heavy equipment excavates river channel for the foundation of t...
The bridge access road at Flaming Gorge was graded and graveled to make a temporary road leading to ...
The bridge access road at Flaming Gorge was graded and graveled to make a temporary road leading to ...
From above can be seen the tunnel being drilled through the mountain so construction can begin on th...
Power Shovel perched on the ledge of the canyon wall is used to excavate deep 14 foot pits into whic...
Power shovels were used to excavate deep 14 foot pits into which anchors for the suspension bridge w...
Power shovels were used to excavate deep 14 foot pits into which anchors for the suspension bridge w...
Preliminary to the construction of the suspension bridge that will link Vernal with Dutch John a big...
Preliminary to the construction of the suspension bridge that will link Vernal with Dutch John a big...
Power shovels along with other equipment begin work for the suspension bridge that will be construct...
Power shovels along with other equipment begin work for the suspension bridge that will be construct...
Holes were dug and filled with cement to place frames to run these steel cables that supported the s...
Holes were dug and filled with cement to place frames to run these steel cables that supported the s...
The diversion tunnel is a gaping big black hole in the rock ledge at the bottom of Flaming Gorge Can...
The diversion tunnel is a gaping big black hole in the rock ledge at the bottom of Flaming Gorge Can...
Operations at Flaming Gorge damsite. Heavy equipment excavates river channel for the foundation of t...
The bridge access road at Flaming Gorge was graded and graveled to make a temporary road leading to ...
The bridge access road at Flaming Gorge was graded and graveled to make a temporary road leading to ...
From above can be seen the tunnel being drilled through the mountain so construction can begin on th...