Drop at station 79+20, viewed from left bank. Flow in the canal is 22 second-feet. An area of the riprap on the right side slope extending 20 feet downstream has subsided .5 foot. Downstrewam of the left wall, subsidence of up to 1 foot has occurred in a small area. Subsidence at the crest is about .5 foot
Looking upstream at drop structure Station 93+40 Note subsidence of riprap below wier section. This ...
Steinaker Feeder Canal--Center and left side of downstream portion of drop at Station 69+00. Lath in...
Upstream view of drop at station 89+40. Note subsidence of 36" riprap below the weir section. Three ...
Drop at station 81+20, viewed from left bank. Downstream of the wall, on the right slope, the riprap...
View along right downstream slope of drop at station 81+20. Subsidence up to 2 feet has occurred. AT...
Looking upstream along right slope of drop at station 72+20. The riprap on this slope from the wall ...
View of drop at station 77+40, from left bank. Riprap at lower edge of snow patch has subsided from ...
View of drop at station 89+40, from left bank, with flow of 22 second-feet. Riprap on each side slop...
Upstream view of drop at canal station 69+00. Note significant amount of subsidence of riprap below ...
Upstream view of drop at station 142+05. Note the 2 feet and 3 feet of subsidence of 36 riprap below...
Upstream view of drop at Station 101+40. Note subsidence of 36" riprap immediately downstream of the...
Upstream view of drop at Station 86+40. Note subsidence of 36"riprap below the throat section. Erosi...
View directly across the canal at the area from which riprap and subsided subgrade had been removed ...
Steinaker Feeder Canal--General view of drop at Station 119+40 showing 36" riprap subsidence along r...
Upstream view of drop at station 81+20. Note subsidence of riprap below throat section
Looking upstream at drop structure Station 93+40 Note subsidence of riprap below wier section. This ...
Steinaker Feeder Canal--Center and left side of downstream portion of drop at Station 69+00. Lath in...
Upstream view of drop at station 89+40. Note subsidence of 36" riprap below the weir section. Three ...
Drop at station 81+20, viewed from left bank. Downstream of the wall, on the right slope, the riprap...
View along right downstream slope of drop at station 81+20. Subsidence up to 2 feet has occurred. AT...
Looking upstream along right slope of drop at station 72+20. The riprap on this slope from the wall ...
View of drop at station 77+40, from left bank. Riprap at lower edge of snow patch has subsided from ...
View of drop at station 89+40, from left bank, with flow of 22 second-feet. Riprap on each side slop...
Upstream view of drop at canal station 69+00. Note significant amount of subsidence of riprap below ...
Upstream view of drop at station 142+05. Note the 2 feet and 3 feet of subsidence of 36 riprap below...
Upstream view of drop at Station 101+40. Note subsidence of 36" riprap immediately downstream of the...
Upstream view of drop at Station 86+40. Note subsidence of 36"riprap below the throat section. Erosi...
View directly across the canal at the area from which riprap and subsided subgrade had been removed ...
Steinaker Feeder Canal--General view of drop at Station 119+40 showing 36" riprap subsidence along r...
Upstream view of drop at station 81+20. Note subsidence of riprap below throat section
Looking upstream at drop structure Station 93+40 Note subsidence of riprap below wier section. This ...
Steinaker Feeder Canal--Center and left side of downstream portion of drop at Station 69+00. Lath in...
Upstream view of drop at station 89+40. Note subsidence of 36" riprap below the weir section. Three ...