There is increasing interest in the cost of railway infrastructure access as a variety of private companies operate trains with different lengths over a common rail network. It is important to have a method for evaluating the cost of adding an additional train to a railway timetable. This is particularly so for single line track with occasional passing loops. The concept of a fixed loop capacity is extended to one that is dependent on the trains. We develop a model for scheduling a heterogeneous set of trains on single line systems with loops. Our method minimises the total weighted delay. A Lagrangian Relaxation technique is used that relaxes the capacity constraints for track segments and super segments. We measure the delay for each trai...
The task of the train timetabling problem or track allocation problem is to find conflict free sched...
Railway capacity is a vague concept, related to the possibility to run a maximal transport performan...
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
There is increasing interest in the cost of railway infrastructure access as a variety of private co...
The Train Timetabling Problem (TTP) aims at determining an optimal timetable for a set of trains whi...
We propose a Lagrangian-based heuristic approach to obtain robust solutions to the Train Timetabling...
AbstractThe train timetabling problem (TTP) aims at determining an optimal timetable for a set of tr...
The train timetabling problem considered is to find conflict free routes for a set of trains in a gi...
The train timetabling problem aims at determining a periodic timetable for a set of trains that does...
We study the problem of freight transportation in railway networks, where both passenger and freight...
This paper describes the development and use of a model designed to optimise train schedules on sing...
The overall performance of a train schedule is measured in terms of the mean and variance of train l...
Railroad managers must determine (1) which pairs of terminals are to be provided with direct train c...
A single-track train timetabling problem is studied in order to minimize the total train travel time...
A significant growth of the railway transportation demand is forecasted in the next decades which ne...
The task of the train timetabling problem or track allocation problem is to find conflict free sched...
Railway capacity is a vague concept, related to the possibility to run a maximal transport performan...
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
There is increasing interest in the cost of railway infrastructure access as a variety of private co...
The Train Timetabling Problem (TTP) aims at determining an optimal timetable for a set of trains whi...
We propose a Lagrangian-based heuristic approach to obtain robust solutions to the Train Timetabling...
AbstractThe train timetabling problem (TTP) aims at determining an optimal timetable for a set of tr...
The train timetabling problem considered is to find conflict free routes for a set of trains in a gi...
The train timetabling problem aims at determining a periodic timetable for a set of trains that does...
We study the problem of freight transportation in railway networks, where both passenger and freight...
This paper describes the development and use of a model designed to optimise train schedules on sing...
The overall performance of a train schedule is measured in terms of the mean and variance of train l...
Railroad managers must determine (1) which pairs of terminals are to be provided with direct train c...
A single-track train timetabling problem is studied in order to minimize the total train travel time...
A significant growth of the railway transportation demand is forecasted in the next decades which ne...
The task of the train timetabling problem or track allocation problem is to find conflict free sched...
Railway capacity is a vague concept, related to the possibility to run a maximal transport performan...
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...