While technical failures remain the most common triggers for overruns in metro projects, the causes have not typically been deficiencies in the underlying engineering principles but in project management. This work involves the complementary use of requirements and risk management processes and real options theory. The Crossrail project provides a case study with a scheme design for an underground station at Farringdon being considered in detail.The requirements process documented in this research is capable of providing an interactive format for managing project requirements and importantly, any changes that are made to them. This is achieved using commercial software (Telelogic DOORS®) and it is shown that this process is effective when w...
Railway is a mode of transportation that provides several advantages over other modes in terms of pu...
Valuing a project based on net present value does not easily capture the flexibility that the projec...
Investment decisions should not be taken without an in-depth analysis of the risks. This is an impor...
While technical failures remain the most common triggers for overruns in metro projects, the causes ...
ABSTRACT Risk, including economic risk, is increasingly a concern for public policy and management. ...
Risk, including economic risk, is increasingly a concern for public policy and management. The possi...
Risk, including economic risk, is increasingly a concern for public policy and management. The possi...
This research concerns the management of dynamic complexity for a particularly demanding form of meg...
Risk analysis plays a vital role in controlling and managing cost overruns in complex construction p...
The provision of safe, efficient, reliable and affordable railway transport requires the railway tr...
Railway construction projects are exposed to various risks that can cause snowball effects, which al...
Building rail infrastructure creates a significant opportunity cost for taxpayers. This makes it imp...
The global movement away from heavy dependence on public sector financing, and toward greater relian...
Mega infrastructure project like the railway is very complex, unique, and impactful in nature. Many ...
Railway infrastructure investments are really complex, demanding and time consuming processes. Two m...
Railway is a mode of transportation that provides several advantages over other modes in terms of pu...
Valuing a project based on net present value does not easily capture the flexibility that the projec...
Investment decisions should not be taken without an in-depth analysis of the risks. This is an impor...
While technical failures remain the most common triggers for overruns in metro projects, the causes ...
ABSTRACT Risk, including economic risk, is increasingly a concern for public policy and management. ...
Risk, including economic risk, is increasingly a concern for public policy and management. The possi...
Risk, including economic risk, is increasingly a concern for public policy and management. The possi...
This research concerns the management of dynamic complexity for a particularly demanding form of meg...
Risk analysis plays a vital role in controlling and managing cost overruns in complex construction p...
The provision of safe, efficient, reliable and affordable railway transport requires the railway tr...
Railway construction projects are exposed to various risks that can cause snowball effects, which al...
Building rail infrastructure creates a significant opportunity cost for taxpayers. This makes it imp...
The global movement away from heavy dependence on public sector financing, and toward greater relian...
Mega infrastructure project like the railway is very complex, unique, and impactful in nature. Many ...
Railway infrastructure investments are really complex, demanding and time consuming processes. Two m...
Railway is a mode of transportation that provides several advantages over other modes in terms of pu...
Valuing a project based on net present value does not easily capture the flexibility that the projec...
Investment decisions should not be taken without an in-depth analysis of the risks. This is an impor...