Recordkeeping is an essential component of a CAFO permit. A producer must keep records current to satisfy the requirements of the regulations. Additionally, without current records, inspectors cannot determine and producers cannot prove the nutrient Management plan (NMP) has been implemented as approved. All records required by the regulation must be maintained for five years, and must be made available to TDEC or EPA upon request
Iowa Manure Matters: Odor and Nutrient Management is published by Iowa State University Extension, w...
The purpose of this document is to discuss the importance of farm record keeping and provide produce...
A Brief History and Background of the EPA CAFO Rule U.S. Environmental Protection Agency (EPA) rules...
As a condition of the permit, the producer must allow personnel from the TDEC or the U.S. EPA to ins...
All CAFOs must submit an annual report to TDEC and TDA between January 1 and February 15
All Large CAFOs with dry litter operations, all Medium CAFOs and all designated CAFOs are required t...
The new CAFO rules, published February 12, 2003 in the Federal Register, were adopted within the aut...
A CAFO covered under a general permit must notify the TDEC when the CAFO is no longer in operation. ...
The New CAFO Rules: What is Required in a Nutrient Management Plan? As a part of the U.S. Environme...
All wastewater discharges from a CAFO to waters of the state of Tennessee are prohibited. For existi...
AFO that does not land apply manure, litter or process wastewater may request that it be determined ...
Any liquid waste management system that is constructed, modified, repaired or placed into operation ...
On February 12, 2003, the Environment Protection Agency (EPA) published new concentrated animal feed...
A Comprehensive Nutrient Management Plan (CNMP) is a group of conservation practices and management ...
Land Application Setback and Buffer Requirements for NPDES Permitted Large CAFOs Large Concentrated ...
Iowa Manure Matters: Odor and Nutrient Management is published by Iowa State University Extension, w...
The purpose of this document is to discuss the importance of farm record keeping and provide produce...
A Brief History and Background of the EPA CAFO Rule U.S. Environmental Protection Agency (EPA) rules...
As a condition of the permit, the producer must allow personnel from the TDEC or the U.S. EPA to ins...
All CAFOs must submit an annual report to TDEC and TDA between January 1 and February 15
All Large CAFOs with dry litter operations, all Medium CAFOs and all designated CAFOs are required t...
The new CAFO rules, published February 12, 2003 in the Federal Register, were adopted within the aut...
A CAFO covered under a general permit must notify the TDEC when the CAFO is no longer in operation. ...
The New CAFO Rules: What is Required in a Nutrient Management Plan? As a part of the U.S. Environme...
All wastewater discharges from a CAFO to waters of the state of Tennessee are prohibited. For existi...
AFO that does not land apply manure, litter or process wastewater may request that it be determined ...
Any liquid waste management system that is constructed, modified, repaired or placed into operation ...
On February 12, 2003, the Environment Protection Agency (EPA) published new concentrated animal feed...
A Comprehensive Nutrient Management Plan (CNMP) is a group of conservation practices and management ...
Land Application Setback and Buffer Requirements for NPDES Permitted Large CAFOs Large Concentrated ...
Iowa Manure Matters: Odor and Nutrient Management is published by Iowa State University Extension, w...
The purpose of this document is to discuss the importance of farm record keeping and provide produce...
A Brief History and Background of the EPA CAFO Rule U.S. Environmental Protection Agency (EPA) rules...