"June 2006."; Includes bibliographical references (leaf 80).; Final report.; Performed by Battelle Memorial Institute; prepared in cooperation with Ohio Dept. of Transportation and U.S. Dept. of Transportation, Federal Highway Administration under State job no. 134162; Harvested from the web on 9/19/06For roadside work-zones in areas that have opposing traffic flow, safety is enhanced if the temporary barriers incorporate a "glare-shield" that blocks headlight glare from opposing traffic. Currently-available 32-inch portable concrete barriers require the use of an add-on glare shield attached to the top of the barrier. The add-on glare shields are an extra expense and complicate barrier set-up and handling. An alternative solution was to de...
Portable concrete barriers (PCBs) are segmented barriers made of precast concrete units that are con...
Based on the proposed changes to the National Cooperative Highway Research Program (NCHRP) Report No...
2017Final Report: 2014 \u2013 2017PDFTech ReportTRP-03-337-17TPF-5(193) Supplement #75SWZDI TPF-5(29...
665069915Final report.PDFTech ReportFHWA/OH-2006/16134162Barriers (Roads)New JerseyBattelle Memorial...
665069600Executive summary report.PDFTech ReportFHWA/OH-2006/16134162Barriers (Roads)New JerseyBatte...
A temporary concrete median barrier (CMB) was designed and tested for compliance under the Test Leve...
https://doi.org/10.21949/15181562003PDFTech ReportFHWA/MT-03-002/81628162Barriers (Roads)Median barr...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
A sight-distance problem is associated with use of 32-inch tall concrete longitudinal barriers, spec...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
PDFTech ReportTRP-03-300-14Work zone traffic controlTemporary barriersGuardrailsSimulationHighway sa...
Design of high-performance concrete barriers for heavy vehicles has advanced little in recent years....
Road construction often requires that work zones be created and shielded by portable concrete barrie...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
The objective of this research was to design a transition from temporary concrete barriers to a perm...
Portable concrete barriers (PCBs) are segmented barriers made of precast concrete units that are con...
Based on the proposed changes to the National Cooperative Highway Research Program (NCHRP) Report No...
2017Final Report: 2014 \u2013 2017PDFTech ReportTRP-03-337-17TPF-5(193) Supplement #75SWZDI TPF-5(29...
665069915Final report.PDFTech ReportFHWA/OH-2006/16134162Barriers (Roads)New JerseyBattelle Memorial...
665069600Executive summary report.PDFTech ReportFHWA/OH-2006/16134162Barriers (Roads)New JerseyBatte...
A temporary concrete median barrier (CMB) was designed and tested for compliance under the Test Leve...
https://doi.org/10.21949/15181562003PDFTech ReportFHWA/MT-03-002/81628162Barriers (Roads)Median barr...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
A sight-distance problem is associated with use of 32-inch tall concrete longitudinal barriers, spec...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
PDFTech ReportTRP-03-300-14Work zone traffic controlTemporary barriersGuardrailsSimulationHighway sa...
Design of high-performance concrete barriers for heavy vehicles has advanced little in recent years....
Road construction often requires that work zones be created and shielded by portable concrete barrie...
Often, road construction causes the need to create a work zone. In these scenarios, portable concret...
The objective of this research was to design a transition from temporary concrete barriers to a perm...
Portable concrete barriers (PCBs) are segmented barriers made of precast concrete units that are con...
Based on the proposed changes to the National Cooperative Highway Research Program (NCHRP) Report No...
2017Final Report: 2014 \u2013 2017PDFTech ReportTRP-03-337-17TPF-5(193) Supplement #75SWZDI TPF-5(29...