Title from cover.; "August 2005."; Includes bibliographical references (p. 37).; Final report.; Performed by University of Cincinnati, Dept. of Civil and Environmental Engineering, sponsored by Ohio Dept. of Transportation in cooperation with the U.S. Dept. of Transportation, Federal Highway Administration under state job no.; Harvested from the web on 2/16/06This project examined various methods of innovative bridge design and construction techniques to expedite construction. The following methods have been identified as possible method of reducing the time needed for bridge construction: precast substructures; prefabricated composite bridge units; prefabricated superstructure units, such as adjacent boxes, which do not need a separate wea...