A photo of the check dams to prevent gully washes. Forty erosion control dams were constructed in several badly washed gullies. This photo was taken as part of Project No. 46b, Erosion Control
Photograph of drop-inlet gully control structure built by the Soil Conservation District through the...
Photograph of erosion control project. Lateral roads were formerly unassessable due to huge gully ac...
Photograph of partial control of large gully which was rapidly destroying 175 acres of valuable land...
A photo of the log check dams. The photo was taken as part of Project No. 46b, Erosion Control
A photo taken while workmen were cutting and grading bank along the entrance road to prevent erosion...
Photograph of a view of a future erosion control dam site to control gully. The back of the photogra...
Photograph of an erosion control dam. A community project. Looking west at gully eating back into cr...
Photograph of a view of a future erosion control dam site to control gully. The back of the photogra...
Photograph of a gully above erosion control dam before construction. Gully about 18 feet deep
Photograph of erosion. The gully was caused by plowing furrows to divert water from cultivated land....
A photo of a group of men berm grading along park entrance roadway. This photo was taken as part of ...
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of gully control. This area was previously badly eroded with a deep gully. Gully was fill...
Photograph of an erosion control dam. Active gully in the background will be stabilized by the erosi...
Photograph of erosion control project. Lateral roads were formerly unassessable due to huge gully ac...
Photograph of drop-inlet gully control structure built by the Soil Conservation District through the...
Photograph of erosion control project. Lateral roads were formerly unassessable due to huge gully ac...
Photograph of partial control of large gully which was rapidly destroying 175 acres of valuable land...
A photo of the log check dams. The photo was taken as part of Project No. 46b, Erosion Control
A photo taken while workmen were cutting and grading bank along the entrance road to prevent erosion...
Photograph of a view of a future erosion control dam site to control gully. The back of the photogra...
Photograph of an erosion control dam. A community project. Looking west at gully eating back into cr...
Photograph of a view of a future erosion control dam site to control gully. The back of the photogra...
Photograph of a gully above erosion control dam before construction. Gully about 18 feet deep
Photograph of erosion. The gully was caused by plowing furrows to divert water from cultivated land....
A photo of a group of men berm grading along park entrance roadway. This photo was taken as part of ...
Photograph of an area above erosion control dam. A follow-up of OK-1584-6. OK-1584-6
Photograph of gully control. This area was previously badly eroded with a deep gully. Gully was fill...
Photograph of an erosion control dam. Active gully in the background will be stabilized by the erosi...
Photograph of erosion control project. Lateral roads were formerly unassessable due to huge gully ac...
Photograph of drop-inlet gully control structure built by the Soil Conservation District through the...
Photograph of erosion control project. Lateral roads were formerly unassessable due to huge gully ac...
Photograph of partial control of large gully which was rapidly destroying 175 acres of valuable land...