ABSTRACT Cost control is the heart of activities for contractors, because from this methode the company can earn profit and reduce the risk. Project managers must undertake project controls by "entrepreneurial spirit" or entrepreneurial spirit, so the work value shown, not the "intelligence of speech". The purpose of controlling the implementation of construction projects on "Building Construction on Concrete Bridges" is to be able to know whether the implementation in accordance with the design that has been set, so useful to be able to reduce the occurrence of undesirable irregularities. The result shown until the 8th week (when evaluated), it is found that the Schedule Variance (SV) Value is Rp. (293,892,353.04), this is S
In the world of construction, pengendaliaan time, cost and quality are very important for achieving ...
The East Java Province Inspectorate Building Construction Project Phase II has an important role in ...
In a construction project, there are several aspects that cause the project not to go according to p...
ABSTRACT Cost control is the heart of activities for contractors, because from this methode the comp...
Cost control is the heart of activities for contractors, because from this methode the company can e...
ABSTRACT Cost and time control is the heart of activities for contractors, because of this effort th...
Earned value concept is one of monitoring technique on construction process which is based on the in...
The main resources limited to the stage of implementing a construction project are cost, quality and...
In implementation in the field, it is not uncommon for projects to experience delays in completion a...
Planning and controlling costs and time is part of the overall construction project management. In a...
ABSTRACT During the construction period there is often an incompatibility schedule between the plann...
In the construction project planning and controlling is the most basic function in realizing the suc...
ABSTRACT The main objectives in the construction project are completed with the appropriate cost, ti...
Construction projects have their own complexity, from physical and cost planning, time control and b...
The success of a project is uncertain. There is a possibility that the project was successful or fai...
In the world of construction, pengendaliaan time, cost and quality are very important for achieving ...
The East Java Province Inspectorate Building Construction Project Phase II has an important role in ...
In a construction project, there are several aspects that cause the project not to go according to p...
ABSTRACT Cost control is the heart of activities for contractors, because from this methode the comp...
Cost control is the heart of activities for contractors, because from this methode the company can e...
ABSTRACT Cost and time control is the heart of activities for contractors, because of this effort th...
Earned value concept is one of monitoring technique on construction process which is based on the in...
The main resources limited to the stage of implementing a construction project are cost, quality and...
In implementation in the field, it is not uncommon for projects to experience delays in completion a...
Planning and controlling costs and time is part of the overall construction project management. In a...
ABSTRACT During the construction period there is often an incompatibility schedule between the plann...
In the construction project planning and controlling is the most basic function in realizing the suc...
ABSTRACT The main objectives in the construction project are completed with the appropriate cost, ti...
Construction projects have their own complexity, from physical and cost planning, time control and b...
The success of a project is uncertain. There is a possibility that the project was successful or fai...
In the world of construction, pengendaliaan time, cost and quality are very important for achieving ...
The East Java Province Inspectorate Building Construction Project Phase II has an important role in ...
In a construction project, there are several aspects that cause the project not to go according to p...