The problems involved in network planning for project control are examined with reference to the published work in this field. Various solutions are described and compared. A detailed investigation is made of the standard assumptions concerning expected activity durations. The different approaches to the estimation of these times are shown to be inconsistent with their areas of application. A global heuristic solution to the problem of finding the minimum value of the maximum resource requirement during a project is presented. This procedure uses a modified resource profile. The results of a comparison between this solution and a standard local solution indicate a slight improvement with a considerable increase in computing time. The new ...
The problem of obtaining minimum duration project schedules subject to resource constraints is addre...
The methodology of project management has been widespread in organizations of different functions an...
The paper presents a method of network planning CPM – Critical Path Method. The author compares mode...
Activities of a project often must be scheduled under limited resources. In general, the aim of the ...
Traditional critical path methods imply the assumption of unlimited availability of resources. Math...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
MEng (Mechanical Engineering), North-West University, Potchefstroom CampusThe Resource-constrained P...
Includes bibliographical references (leaves 222-225)Activity networks have been widely used in the p...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
In many solution methods for resource-constrained project scheduling, it is assumed that both the du...
Abstract: In this paper we consider the discrete time/resource trade-off problem in project networks...
The main objective of this study was to find a simple and quick procedure on the microcomputer for s...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
Project management has become a widespread instrument enabling organizations to efficiently master t...
The majority of resource-constrained project scheduling efforts assume perfect information about the...
The problem of obtaining minimum duration project schedules subject to resource constraints is addre...
The methodology of project management has been widespread in organizations of different functions an...
The paper presents a method of network planning CPM – Critical Path Method. The author compares mode...
Activities of a project often must be scheduled under limited resources. In general, the aim of the ...
Traditional critical path methods imply the assumption of unlimited availability of resources. Math...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
MEng (Mechanical Engineering), North-West University, Potchefstroom CampusThe Resource-constrained P...
Includes bibliographical references (leaves 222-225)Activity networks have been widely used in the p...
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project da...
In many solution methods for resource-constrained project scheduling, it is assumed that both the du...
Abstract: In this paper we consider the discrete time/resource trade-off problem in project networks...
The main objective of this study was to find a simple and quick procedure on the microcomputer for s...
The report gives an overview of resource-constrained project scheduling with time windows. First it ...
Project management has become a widespread instrument enabling organizations to efficiently master t...
The majority of resource-constrained project scheduling efforts assume perfect information about the...
The problem of obtaining minimum duration project schedules subject to resource constraints is addre...
The methodology of project management has been widespread in organizations of different functions an...
The paper presents a method of network planning CPM – Critical Path Method. The author compares mode...