Pre- and post-mining land capability (productivity) assessment on an average-property-basis is a requirement of surface mine reclamation in British Columbia. At Quintette Operating Corporation, a capability assessment was completed in 1997. The results of the assessment showed that pre- and post-disturbance land capability comparisons for the Shikano/Plantsite and Mesa/Wolverine areas were similar. These results are favorable with respect to Quintette's permit requirements of "equivalent land capability on an average property basis." The information generated by this assessment has enabled the environmental personnel at Quintette to optimize reclamation planning for the various post-mining landforms. In this paper, the methodology and resul...
At the mine approval phase, there is logically a focus on mine start-up and operational requirements...
At the end of mine life an estimated 6900 hectares of land will have been disturbed at the Highland ...
At the mine approval phase, there is logically a focus on mine start-up and operational requirements...
Reclamation assessments on mine sites, to determine equivalent land capability and to meet the regul...
A large number of operating, dormant, and abandoned minesites in Canada and the U.S. were visited in...
The concept of this thesis was developed during the author's two years of work with the British Colu...
Capability inventory surveys have been conducted in the province for several years. Inherent in this...
Since 1982, Quintette has conducted reclamation on mining disturbances each and every year, resultin...
There are numerous mine sites across Canada and throughout the world that are considered inactive. F...
Collaborative discussions were initiated in 2001 through an 'ad hoc' British Columbia (BC) governmen...
British Columbia leads the world in mined land reclamation. Effective programs for re-integration of...
Mining in British Columbia is considered a temporary "use" of the Land with operators required to de...
BC’s Ministry of Energy, Mines and Petroleum Resources is developing a Reclamation Guide for Mines i...
Site-level evaluation of reclamation performance and residual impacts (i.e., post-reclamation effect...
The Mesa/Wolverine open pit coal mine at Quintette Operating Corporation is located at 1500 to 1850 ...
At the mine approval phase, there is logically a focus on mine start-up and operational requirements...
At the end of mine life an estimated 6900 hectares of land will have been disturbed at the Highland ...
At the mine approval phase, there is logically a focus on mine start-up and operational requirements...
Reclamation assessments on mine sites, to determine equivalent land capability and to meet the regul...
A large number of operating, dormant, and abandoned minesites in Canada and the U.S. were visited in...
The concept of this thesis was developed during the author's two years of work with the British Colu...
Capability inventory surveys have been conducted in the province for several years. Inherent in this...
Since 1982, Quintette has conducted reclamation on mining disturbances each and every year, resultin...
There are numerous mine sites across Canada and throughout the world that are considered inactive. F...
Collaborative discussions were initiated in 2001 through an 'ad hoc' British Columbia (BC) governmen...
British Columbia leads the world in mined land reclamation. Effective programs for re-integration of...
Mining in British Columbia is considered a temporary "use" of the Land with operators required to de...
BC’s Ministry of Energy, Mines and Petroleum Resources is developing a Reclamation Guide for Mines i...
Site-level evaluation of reclamation performance and residual impacts (i.e., post-reclamation effect...
The Mesa/Wolverine open pit coal mine at Quintette Operating Corporation is located at 1500 to 1850 ...
At the mine approval phase, there is logically a focus on mine start-up and operational requirements...
At the end of mine life an estimated 6900 hectares of land will have been disturbed at the Highland ...
At the mine approval phase, there is logically a focus on mine start-up and operational requirements...