This paper is a continuation of work to develop and test a prototype computerbased system to address the needs of a public owner - The British Columbia Ministry of Transportation and Highways. The Ministry continues to be interested in how they can exploit information technologies and the prototype system discussed here proceeds to address their concerns. After the research completed by Ralph English in the Spring of 1995 was concluded several outstanding issues remained. These included reporting features for certain routines, development of a quality management routine, a site trial, and modifications to current practices, such as improved record associations with pay items and activities. This prototype was built on top of a proje...
This dissertation focusses on the process of real time progress reporting in relation problems conne...
The construction industry has taken longer to move into the use of modern management than other indu...
This report is the outcome of a study carried out to evaluate the Management Information Systems use...
This paper presents the results of a study to develop and field test a prototype computer-based sys...
This paper addresses how best to capture the as-built story of construction projects through site do...
The recognized goal of maintaining site records is to provide the right information to the right per...
The control needed in the management of a project was analysed with particular reference to the uniq...
The concept of daily site reporting is not new to the construction industry. For years, superintende...
This action research address URBN Design Studios focal issues concerning the lack of filing and reco...
On most construction sites, a considerable volume of records will be amassed by the main parties and...
If construction managers are to carry out their responsibilities in the areas of construction and it...
If construction managers are to carry out their responsibilities in the areas of construction and i...
A prototype Project Management Quality Cost information System, PROMQACS, was developed to determin...
In many construction companies it is a policy that all the work done on construction sites must be d...
For the last ten years, Computers have been used extensively in the development and procurement of c...
This dissertation focusses on the process of real time progress reporting in relation problems conne...
The construction industry has taken longer to move into the use of modern management than other indu...
This report is the outcome of a study carried out to evaluate the Management Information Systems use...
This paper presents the results of a study to develop and field test a prototype computer-based sys...
This paper addresses how best to capture the as-built story of construction projects through site do...
The recognized goal of maintaining site records is to provide the right information to the right per...
The control needed in the management of a project was analysed with particular reference to the uniq...
The concept of daily site reporting is not new to the construction industry. For years, superintende...
This action research address URBN Design Studios focal issues concerning the lack of filing and reco...
On most construction sites, a considerable volume of records will be amassed by the main parties and...
If construction managers are to carry out their responsibilities in the areas of construction and it...
If construction managers are to carry out their responsibilities in the areas of construction and i...
A prototype Project Management Quality Cost information System, PROMQACS, was developed to determin...
In many construction companies it is a policy that all the work done on construction sites must be d...
For the last ten years, Computers have been used extensively in the development and procurement of c...
This dissertation focusses on the process of real time progress reporting in relation problems conne...
The construction industry has taken longer to move into the use of modern management than other indu...
This report is the outcome of a study carried out to evaluate the Management Information Systems use...