Purpose: We aim to examine the capacitated multi-item lot sizing problem which is a typical example of a large bucket model, where many different items can be produced on the same machine in one time period. We propose a new approach to determine the production sequence and lot sizes that minimize the sum of start up and setup costs, inventory and production costs over all periods.Design/methodology/approach: The approach is composed of three steps. First, we compute a lower bound on total cost. Then we propose a three sub-steps iteration procedure. We solve optimally the lot sizing problem without considering products sequencing and their cost. Then, we determine products quantities to produce each period while minimizing the storage and v...
International audienceWe address a multi-item capacitated lot-sizing problem with setup times and sh...
In this paper we address the problem of generating the Master Production Schedule in a...
Instances of the multi-item capacitated lot-sizing problem with setup times (MCL) often appear in pr...
Purpose: We aim to examine the capacitated multi-item lot sizing problem which is a typical example ...
In production planning, sequence dependent setup times and costs are often incurred for switchovers ...
This paper presents a novel mathematical programming approach to the single-machine capacitated lot-...
The Capacitated Lot Sizing Problem (CLSP) consists of planning the lot sizes of multiple items over ...
In this research, the single machine capacitated lot-sizing and scheduling problem with sequence- de...
© 2017, Springer Science+Business Media New York. This paper develops and tests an efficient mixed i...
We study several variants of the single machine capacitated lot sizing problem with sequence-depende...
We study several variants of the single machine capacitated lot sizing problem with sequence-depende...
This paper focuses on the capacitated lot sizing problem with two extensions namely setup carryover ...
We study a single machine lot-sizing problem, where n types of products need to be scheduled on the ...
We study a single-machine lot-sizing problem, where n types of products need to be scheduled on the ...
This paper considers the single machine capacitated lot-sizing and scheduling problem (CLSP) with se...
International audienceWe address a multi-item capacitated lot-sizing problem with setup times and sh...
In this paper we address the problem of generating the Master Production Schedule in a...
Instances of the multi-item capacitated lot-sizing problem with setup times (MCL) often appear in pr...
Purpose: We aim to examine the capacitated multi-item lot sizing problem which is a typical example ...
In production planning, sequence dependent setup times and costs are often incurred for switchovers ...
This paper presents a novel mathematical programming approach to the single-machine capacitated lot-...
The Capacitated Lot Sizing Problem (CLSP) consists of planning the lot sizes of multiple items over ...
In this research, the single machine capacitated lot-sizing and scheduling problem with sequence- de...
© 2017, Springer Science+Business Media New York. This paper develops and tests an efficient mixed i...
We study several variants of the single machine capacitated lot sizing problem with sequence-depende...
We study several variants of the single machine capacitated lot sizing problem with sequence-depende...
This paper focuses on the capacitated lot sizing problem with two extensions namely setup carryover ...
We study a single machine lot-sizing problem, where n types of products need to be scheduled on the ...
We study a single-machine lot-sizing problem, where n types of products need to be scheduled on the ...
This paper considers the single machine capacitated lot-sizing and scheduling problem (CLSP) with se...
International audienceWe address a multi-item capacitated lot-sizing problem with setup times and sh...
In this paper we address the problem of generating the Master Production Schedule in a...
Instances of the multi-item capacitated lot-sizing problem with setup times (MCL) often appear in pr...