Purpose: This paper focuses on a classic optimization problem in operations research, the flexible job shop scheduling problem (FJSP), to discuss the method to deal with uncertainty in a manufacturing system.Design/methodology/approach: In this paper, condition based maintenance (CBM), a kind of preventive maintenance, is suggested to reduce unavailability of machines. Different to the simultaneous scheduling algorithm (SSA) used in the previous article (Neale & Cameron,1979), an inserting algorithm (IA) is applied, in which firstly a pre-schedule is obtained through heuristic algorithm and then maintenance tasks are inserted into the pre-schedule scheme.Findings: It is encouraging that a new better solution for an instance in benchmark...
This thesis is concerned with the subject of heuristic scheduling in the context of medium-sized bat...
In order to attain high manufacturing productivity, industry 4.0 merges all the available system and...
When a large number of jobs and machines are taken into account, efficiency in the Job shop scheduli...
This work proposes the impact assessment of the workers in the optimal time of operations in a Flexi...
The present day manufacturing industries face the external challenges like changes in market demand,...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
Purpose:To investigate the efficiency of a discretization procedure utilizing a time-indexed mathe-m...
Flexible job-shop scheduling problem (FJSSP) is an extension of the classical job shop scheduling pr...
International audienceMany heuristics and intelligent methods have been proposed and applied in orde...
This paper presents a meta-heuristic algorithm for solving the Flexible Job Shop Scheduling Problem ...
Due to the character of the original source materials and the nature of batch digitization, quality ...
AbstractThere are different reasons, such as a preventive maintenance, for the lack of machines in t...
A flexible job-shop-scheduling problem is an extension of classical job-shop problems that permit an...
This chapter aims at developing a taxonomic framework to classify the studies on the flexible job sh...
The multitask cell at Volvo Aero Corporation is a flexible job shop containing ten resources aimed a...
This thesis is concerned with the subject of heuristic scheduling in the context of medium-sized bat...
In order to attain high manufacturing productivity, industry 4.0 merges all the available system and...
When a large number of jobs and machines are taken into account, efficiency in the Job shop scheduli...
This work proposes the impact assessment of the workers in the optimal time of operations in a Flexi...
The present day manufacturing industries face the external challenges like changes in market demand,...
The paper studies the scheduling problem in a Flexible Manufacturing System (FMS) operating under un...
Purpose:To investigate the efficiency of a discretization procedure utilizing a time-indexed mathe-m...
Flexible job-shop scheduling problem (FJSSP) is an extension of the classical job shop scheduling pr...
International audienceMany heuristics and intelligent methods have been proposed and applied in orde...
This paper presents a meta-heuristic algorithm for solving the Flexible Job Shop Scheduling Problem ...
Due to the character of the original source materials and the nature of batch digitization, quality ...
AbstractThere are different reasons, such as a preventive maintenance, for the lack of machines in t...
A flexible job-shop-scheduling problem is an extension of classical job-shop problems that permit an...
This chapter aims at developing a taxonomic framework to classify the studies on the flexible job sh...
The multitask cell at Volvo Aero Corporation is a flexible job shop containing ten resources aimed a...
This thesis is concerned with the subject of heuristic scheduling in the context of medium-sized bat...
In order to attain high manufacturing productivity, industry 4.0 merges all the available system and...
When a large number of jobs and machines are taken into account, efficiency in the Job shop scheduli...