A cryogenic thermometer calibration facility has been designed and is being commissioned in preparation for the very stringent requirements on the temperature control of the LHC superconducting magnets. The temperature is traceable in the 1.5 to 30 K range to standards maintained in a national metrological laboratory by using a set of Rhodium-Iron temperature sensors of metrological quality. The calibration facility is designed for calibrating simultaneously 60 industrial cryogenic thermometers in the 1.5 K to 300 K temperature range, a thermometer being a device that includes both a temperature sensor and the wires heat-intercept. The thermometers can be calibrated in good and degraded vacuum or immersed in the surrounding fluid and at dif...
The performance of a sensor is often evaluated by determining to what degree of accuracy a measureme...
The superconducting magnets of the Large Hadron Collider (LHC) distributed over eight sectors of 3.3...
CERN has recently designed and constructed a new cryogenic facility for testing large and heavy supe...
6000 cryogenic temperature sensors of resistive type covering the range from room temperature down t...
Temperature measurement is a key issue in the LHC, as it will be used to regulate the cooling of the...
This paper presents the advancement of a program being carried out in view of selecting the cryogeni...
The LHC under commissioning at CERN will be the world's largest superconducting accelerator and ther...
Laboratory-scale tests aimed at minimizing the thermal loads of the LHC magnet cryostat have gone al...
In the processing of data series, such as in the case of the resistance R vs. temperature T calibrat...
Full-scale thermal models for the Large Hadron Collider (LHC) accelerator cryogenic system have been...
Following the incident on a LHC sector due to an electrical arc on the main dipole bus-bar circuit, ...
Measurement of temperature is an important aspect of any system such as an experimental system, equi...
The superconducting magnets of the Large Hadron Collider (LHC) will be cooled at 1.9 K by distribute...
The superconducting magnets of the Large Hadron Collider (LHC) will be cooled at 1.9 K by distribute...
The LHC is the largest cryogenic installation ever built. For its operation more than 14 000 sensors...
The performance of a sensor is often evaluated by determining to what degree of accuracy a measureme...
The superconducting magnets of the Large Hadron Collider (LHC) distributed over eight sectors of 3.3...
CERN has recently designed and constructed a new cryogenic facility for testing large and heavy supe...
6000 cryogenic temperature sensors of resistive type covering the range from room temperature down t...
Temperature measurement is a key issue in the LHC, as it will be used to regulate the cooling of the...
This paper presents the advancement of a program being carried out in view of selecting the cryogeni...
The LHC under commissioning at CERN will be the world's largest superconducting accelerator and ther...
Laboratory-scale tests aimed at minimizing the thermal loads of the LHC magnet cryostat have gone al...
In the processing of data series, such as in the case of the resistance R vs. temperature T calibrat...
Full-scale thermal models for the Large Hadron Collider (LHC) accelerator cryogenic system have been...
Following the incident on a LHC sector due to an electrical arc on the main dipole bus-bar circuit, ...
Measurement of temperature is an important aspect of any system such as an experimental system, equi...
The superconducting magnets of the Large Hadron Collider (LHC) will be cooled at 1.9 K by distribute...
The superconducting magnets of the Large Hadron Collider (LHC) will be cooled at 1.9 K by distribute...
The LHC is the largest cryogenic installation ever built. For its operation more than 14 000 sensors...
The performance of a sensor is often evaluated by determining to what degree of accuracy a measureme...
The superconducting magnets of the Large Hadron Collider (LHC) distributed over eight sectors of 3.3...
CERN has recently designed and constructed a new cryogenic facility for testing large and heavy supe...