Impoundment of the Caddo River near Arkadelphia, Arkansas began in August, 1969. Detailed patterns of the dissolved oxygen distribution in this reservoir are presented for the period September, 1969 through April, 1971. Although the reservoir had not reached normal pool elevation, thermal stratification accompanied by severe hypolimnic oxygen depletion has been observed. The dissolved oxygen data show that an under flow occurs in the fall of the year and carries dissolved oxygen into the hypolimnic zone. The gradients of dissolved oxygen concentration observed during the winter indicate that the reservoir does not undergo complete mixing. A short summary of the results of trace elements and other water quality parameters is also included
In 1995, the U.S. Geological Survey conducted a study to characterize nutrient concentrations in fiv...
Author Institution: Department of Geological Sciences and Kentucky Geological Survey, University of ...
Pump storage hydroelectricity is a system built by power companies where a dam separating an upper a...
A water quality study of the DeGray Reservoir, Arkansas, was conducted beginning immediately followi...
A detailed water quality survey (including trace metals) was conducted on DeGray Reservoir in south ...
Hyrum Reservoir, Utah, was studied for one year during an artificial destratification project. Previ...
Water quality samples were collected from the Little River system in Pine Creek Lake, Oklahoma, and ...
Author Institution: Biological Readjustment Division, Department of Forestry Relations (T.V.A.
Annual and seasonal fluctuations and relationships are described for discharge, turbidity, chloride,...
Thermal, oxygen and conductance characteristics are described for two impoundments of the White Rive...
Water samples were collected in the Cossatot River-Gillham Lake system during an extended dry period...
The survey results indicate that the impoundment of water behind Hoover Dam has not adversely affect...
Environmental data related to water quality of the Caddo River and its tributaries were collected fr...
An investigation of the trace element content of two impoundments on the Ouachita River, Arkansas, w...
This study was undertaken in order to determine the nature of and the factors that influence the gas...
In 1995, the U.S. Geological Survey conducted a study to characterize nutrient concentrations in fiv...
Author Institution: Department of Geological Sciences and Kentucky Geological Survey, University of ...
Pump storage hydroelectricity is a system built by power companies where a dam separating an upper a...
A water quality study of the DeGray Reservoir, Arkansas, was conducted beginning immediately followi...
A detailed water quality survey (including trace metals) was conducted on DeGray Reservoir in south ...
Hyrum Reservoir, Utah, was studied for one year during an artificial destratification project. Previ...
Water quality samples were collected from the Little River system in Pine Creek Lake, Oklahoma, and ...
Author Institution: Biological Readjustment Division, Department of Forestry Relations (T.V.A.
Annual and seasonal fluctuations and relationships are described for discharge, turbidity, chloride,...
Thermal, oxygen and conductance characteristics are described for two impoundments of the White Rive...
Water samples were collected in the Cossatot River-Gillham Lake system during an extended dry period...
The survey results indicate that the impoundment of water behind Hoover Dam has not adversely affect...
Environmental data related to water quality of the Caddo River and its tributaries were collected fr...
An investigation of the trace element content of two impoundments on the Ouachita River, Arkansas, w...
This study was undertaken in order to determine the nature of and the factors that influence the gas...
In 1995, the U.S. Geological Survey conducted a study to characterize nutrient concentrations in fiv...
Author Institution: Department of Geological Sciences and Kentucky Geological Survey, University of ...
Pump storage hydroelectricity is a system built by power companies where a dam separating an upper a...