This chapter describes the Resource-constrained project scheduling problem as a combinatorial optimization problem. Different combinatorial models of the resource constraints and characterizations of dominant schedule sets are given. In particular, the properties of the order-based representation are studied
We review the most recent lower bounds for the makespan minimization variant of the Resource Constra...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
In this paper we study an extension of the Resource-Constrained Project Scheduling Problem (RCPSP) w...
This title presents a large variety of models and algorithms dedicated to the resource-constrained p...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
In this paper we consider the Project Scheduling Problem with resource constraints, where the object...
: In this paper we consider the Project Scheduling Problem with resource constraints, where the obje...
In this paper, research on the resource-constrained project scheduling problem is classified accordi...
We propose a novel approach to compute bounds on the objective function value of a wide class of res...
We consider one approach to formalize the Resource-Constrained Project Scheduling Problem (RCPSP) in...
A survey on solution techniques for the resource-constrained project scheduling problem (RCPSP) with...
AbstractThe resource-constrained project-scheduling problem (RCPSP) and some of its generalizations ...
For executing the activities of a project, one or several resources are required, which are in gener...
In this paper we propose a new lower bound for the resource constrained project scheduling problem w...
It is the purpose of this article to review the various solutions that have been proposed for the re...
We review the most recent lower bounds for the makespan minimization variant of the Resource Constra...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
In this paper we study an extension of the Resource-Constrained Project Scheduling Problem (RCPSP) w...
This title presents a large variety of models and algorithms dedicated to the resource-constrained p...
This paper addresses the issue of how to generate problem instances of controlled difficulty. It foc...
In this paper we consider the Project Scheduling Problem with resource constraints, where the object...
: In this paper we consider the Project Scheduling Problem with resource constraints, where the obje...
In this paper, research on the resource-constrained project scheduling problem is classified accordi...
We propose a novel approach to compute bounds on the objective function value of a wide class of res...
We consider one approach to formalize the Resource-Constrained Project Scheduling Problem (RCPSP) in...
A survey on solution techniques for the resource-constrained project scheduling problem (RCPSP) with...
AbstractThe resource-constrained project-scheduling problem (RCPSP) and some of its generalizations ...
For executing the activities of a project, one or several resources are required, which are in gener...
In this paper we propose a new lower bound for the resource constrained project scheduling problem w...
It is the purpose of this article to review the various solutions that have been proposed for the re...
We review the most recent lower bounds for the makespan minimization variant of the Resource Constra...
This paper analyses the current state of research regarding solution methods dealing with resource-c...
In this paper we study an extension of the Resource-Constrained Project Scheduling Problem (RCPSP) w...