Master's thesis in Petroleum engineeringWhen oil and gas wells reach the end of their production life, they need to be permanently plugged and abandoned. The requirements for a permanent barrier state that it must cover the entire cross-section of the wellbore, including all annuli. This thesis evaluates a new method of establishing a cross-sectional barrier in areas with poor, non-sealing annular cement. The traditional method is to mill away the section with poor cement and set an open hole cement plug, but due to the ECD effect of milling fluids, this is not always desirable. In some formations on the Gullfaks field, the operational pressure window is too small for section milling. An alternative solution was therefore tried out ...
Master's thesis in Petroleum engineeringNORSOK D-010 and other standards gives a fixed length of cem...
One of the challenges to complete a highly deviated well is to set hydraulically set production pack...
As more and more wells reach the end of their production life, the focus on permanent plug and aband...
When oil and gas wells reach the end of their production life, they need to be permanently plugged a...
Master's thesis in Petroleum engineeringThe useful life of an offshore well is determined by the res...
Master's thesis in Petroleum engineeringWhen an oil or gas well is not profitable to produce from an...
Improving the present P&A operation with respect to costs and safety is of current interest to the p...
Master's thesis in Petroleum engineeringIn the past years there has been an increased focus on decom...
Master's thesis in Petroleum engineeringWhen a well is permanently plugged and abandoned (P&A), a pl...
In a similar fashion to the commonly used saying ?that the only thing certain in life is death?, the...
Master's thesis in Petroleum engineeringIn the North Sea, the average field age is increasing and a ...
There is an upcoming "P&A wave" of wells that need to be permanently plugged and abandoned, especial...
Master's thesis in Petroleum engineeringA preselected Wisting well injector design has been used as ...
One of the challenges to complete a highly deviated well is to set hydraulically set production pack...
Master's thesis in Petroleum engineeringNORSOK D-010 and other standards gives a fixed length of cem...
Master's thesis in Petroleum engineeringNORSOK D-010 and other standards gives a fixed length of cem...
One of the challenges to complete a highly deviated well is to set hydraulically set production pack...
As more and more wells reach the end of their production life, the focus on permanent plug and aband...
When oil and gas wells reach the end of their production life, they need to be permanently plugged a...
Master's thesis in Petroleum engineeringThe useful life of an offshore well is determined by the res...
Master's thesis in Petroleum engineeringWhen an oil or gas well is not profitable to produce from an...
Improving the present P&A operation with respect to costs and safety is of current interest to the p...
Master's thesis in Petroleum engineeringIn the past years there has been an increased focus on decom...
Master's thesis in Petroleum engineeringWhen a well is permanently plugged and abandoned (P&A), a pl...
In a similar fashion to the commonly used saying ?that the only thing certain in life is death?, the...
Master's thesis in Petroleum engineeringIn the North Sea, the average field age is increasing and a ...
There is an upcoming "P&A wave" of wells that need to be permanently plugged and abandoned, especial...
Master's thesis in Petroleum engineeringA preselected Wisting well injector design has been used as ...
One of the challenges to complete a highly deviated well is to set hydraulically set production pack...
Master's thesis in Petroleum engineeringNORSOK D-010 and other standards gives a fixed length of cem...
Master's thesis in Petroleum engineeringNORSOK D-010 and other standards gives a fixed length of cem...
One of the challenges to complete a highly deviated well is to set hydraulically set production pack...
As more and more wells reach the end of their production life, the focus on permanent plug and aband...