In this article we analyse frequency, actions regarding preventive maintenance frequency and inspections that must be carried out when dealing with 60-800 kV equipment (insulators, circuit breakers, isolator switches, instrument transformers and surge arresters), in order to keep them working properly, within manufacturers’ instructions, and to avoid premature ageing of the equipment, namely busbar system and insulators, circuit breakers, isolator switches, instrument transformers and surge arresters
The work is devoted to specific operating conditions analysis of power transformers are placed on ru...
This article discusses transformer temperature monitoring where a strategy of reduction in maintenan...
A study of transients in a high voltage substation 400/110 kV is presented in the paper. An analysis...
In this article we analyse frequency, actions regarding preventive maintenance frequency and inspect...
As an important node in the power grid, substation plays a very important role in the whole power gr...
The article describes new trends in the field of continuous on-line condition monitoring of transfor...
This article discusses myths and truths around unrelenting challenges faced by substation owners ove...
A partial discharge measurement is a sensitive tool to assess the insulation integrity of a high vol...
In 2008, CIGRÉ WG A3.22 published Technical Brochure 362: ?Technical Requirements for Substation Equ...
This article discusses the application of dielectric frequency response for the analysis of the insu...
The main purpose of this paper was that to compare design of post insulators and their performance o...
Thesis (M.Sc.)-University of KwaZulu-Natal, Durban, 2004.In order to sustain transmission grid avail...
This article aims to draw attention of utility companies and their technical staff to the advantages...
Classic approach to preventive maintenance of equipment in power system substations was based on per...
The article describes the complete procedure carried out in order to determine the cause of high lev...
The work is devoted to specific operating conditions analysis of power transformers are placed on ru...
This article discusses transformer temperature monitoring where a strategy of reduction in maintenan...
A study of transients in a high voltage substation 400/110 kV is presented in the paper. An analysis...
In this article we analyse frequency, actions regarding preventive maintenance frequency and inspect...
As an important node in the power grid, substation plays a very important role in the whole power gr...
The article describes new trends in the field of continuous on-line condition monitoring of transfor...
This article discusses myths and truths around unrelenting challenges faced by substation owners ove...
A partial discharge measurement is a sensitive tool to assess the insulation integrity of a high vol...
In 2008, CIGRÉ WG A3.22 published Technical Brochure 362: ?Technical Requirements for Substation Equ...
This article discusses the application of dielectric frequency response for the analysis of the insu...
The main purpose of this paper was that to compare design of post insulators and their performance o...
Thesis (M.Sc.)-University of KwaZulu-Natal, Durban, 2004.In order to sustain transmission grid avail...
This article aims to draw attention of utility companies and their technical staff to the advantages...
Classic approach to preventive maintenance of equipment in power system substations was based on per...
The article describes the complete procedure carried out in order to determine the cause of high lev...
The work is devoted to specific operating conditions analysis of power transformers are placed on ru...
This article discusses transformer temperature monitoring where a strategy of reduction in maintenan...
A study of transients in a high voltage substation 400/110 kV is presented in the paper. An analysis...